Back to Res 2020-169/approving a change order to the Design-Build Construction Contract with JE Dunn Construction relating to the renovation of the San Marcos Public Library for the addition of a 65,000 gallon rainwater collection system in the net increase amou
Send Res 2020-169/approving a change order to the Design-Build Construction Contract with JE Dunn Construction relating to the renovation of the San Marcos Public Library for the addition of a 65,000 gallon rainwater collection system in the net increase amou Via Email
Email to
Invalid email address.
Your name
Your name may not be empty
Your email address (optional)
Message (optional)
Please limit your message to 250 characters
Please enter the letters shown below.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.