My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-156/Approving a utility adjustment agreement w/MCI Communications Services, Inc. associated with the Loop 82 overpass project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-156/Approving a utility adjustment agreement w/MCI Communications Services, Inc. associated with the Loop 82 overpass project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2014 10:26:02 AM
Creation date
10/22/2013 10:03:11 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-156
Date
10/15/2013
Volume Book
200
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HAYS COUNTY <br />ATTACHMENT <br />"Allll <br />TO UTILITY ADJUSTMENT AGREEMENT NO. CoSM- Bond -01 <br />INCLUDES: <br />PLANS, STATEMENT OF WORK, SPECIFICATIONS, COST ESTIMATE <br />The City of San Marcos in partnership with Texas Department of Transportation <br />( "TXDOT ") are building a grade separation and road bridge where state Road Loop 82 <br />crosses the Union Pacific Railroad (UPRR ") in Hays County, Texas. The bridge support <br />structure will conflict with the MCINerizon Business long distance cable requiring the <br />cable and facilities to be relocated. All MCI long distance fiber optic facilities are located <br />on the UPRR right of way and, after relocated, will remain on the UPRR right of way. <br />The relocation project will require MCI to install approximately 6432 feet of new conduit, <br />place approximately 6800 feet of new fiber optic cable and splice in the new cable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.