My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-156/Approving a utility adjustment agreement w/MCI Communications Services, Inc. associated with the Loop 82 overpass project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-156/Approving a utility adjustment agreement w/MCI Communications Services, Inc. associated with the Loop 82 overpass project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2014 10:26:02 AM
Creation date
10/22/2013 10:03:11 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-156
Date
10/15/2013
Volume Book
200
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page: 01 <br />ATTACHMENT A <br />yet��►►,�►�rt�us;ness OUTSIDE PLANT CONSTRUCTION <br />COST ESTIMATE (ACTIVE APPROVED) <br />09/24/2013 <br />Project/AFE #: R40024 -063 <br />Revision: 1 <br />Date Prepared: <br />02/15/2013 <br />Title <br />SAN MARCOS TX RCUP LOOP 82 BRIDGE <br />Engineer: <br />JOHN KOUGL <br />Site Code: <br />SMFBTX <br />Manager. <br />MARTIN SCHMIDT <br />Investigation #: <br />974 -2012 <br />City: <br />SAN MARCOS <br />Disposition: <br />REFUNDABLE CUP <br />State: <br />TX <br />Footage Impact: <br />5,676 <br />DESCRIPTION OF WORK I <br />TXDOT in partnership with the City of San Marcos will be creating a grade separation, building a road bridge, where State Road Loop 82 crosses the UPRR in San <br />Marcos, TX. The MCI LD cable is in conflict with the bridge support structure and will need to be relocated. This project will require Verizon to install 6,432 feet of new <br />conduit, place approximately 6,800 feet of new 56 -fiber cable and create 1 new splice point. All of the work will be within the UPRR right -of -way. <br />SCHEDULE <br />Eng. Start: 04/08/2013 Const. Start: 11/11/2013 <br />Eng. Complete: 06/07/2013 Const. Complete: 12/1612013 <br />I SUMMARY OF ESTIMATED COSTS I <br />A): <br />B): <br />C): <br />D): <br />E): <br />F): <br />ENGINEERING: <br />INSPECTION SERVICES: <br />FURNISHED MATERIALS: <br />CONTRACTOR UNIT PRICE SCHEDULE: <br />SPLICING LABOR: <br />TOTAL: <br />Construction Manager. Date: <br />$29,373.60 <br />$26,889.00 <br />$9,015.00 <br />$192,540.00 <br />$8,352.00 <br />$266,169.60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.