My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-156/Approving a utility adjustment agreement w/MCI Communications Services, Inc. associated with the Loop 82 overpass project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-156/Approving a utility adjustment agreement w/MCI Communications Services, Inc. associated with the Loop 82 overpass project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2014 10:26:02 AM
Creation date
10/22/2013 10:03:11 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-156
Date
10/15/2013
Volume Book
200
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page: 02 <br />OUTSIDE PLANT CONSTRUCTION <br />COST ESTIMATE (ACTIVE APPROVED) <br />09/24/2013 <br />Project/AFE #: R40024 -063 SAN MARCOS TX RCUP LOOP 82 BRIDGE <br />D) CONTRACTOR UNIT PRICE SCHEDULE <br />Revision: 1 <br />REF DESCRIPTION: <br />A) ENGINEERING <br />UNIT $: <br />EXT. $: <br />Place Conduit <br />INTERNAL - REF DESCRIPTION: <br />QTY: <br />U /M: <br />UNIT $: <br />EXT. $: <br />OSP Engineers <br />Documentation <br />ROW Labor <br />CONTRACT - REF DESCRIPTION: <br />248 <br />4 <br />8 <br />QTY: <br />hrs <br />hrs <br />hrs <br />U /M: <br />87.00 <br />87.00 <br />87.00 <br />UNIT $: <br />$21,576.00 <br />$348.00 <br />$696.00 <br />EXT. $: <br />Project Management (w /o inspection) - Metro - >500 <br />Cable Design - Metro Underground - >2,500 ft <br />6432 ft. 0.35 <br />6432 ft. 0.70 <br />ENGINEERING Sub TOTAL: <br />$2,251.20 <br />$4,502.40 <br />$29,373.60 <br />25.00 <br />$141,900.00 <br />B) INSPECTION SERVICES <br />INTERNAL - REF DESCRIPTION: <br />QTY: <br />U /M: <br />UNIT $: <br />EXT. $: <br />OPS Inspection (RMOD) <br />EXTERNAL - REF DESCRIPTION: <br />72 <br />QTY: <br />hrs <br />U /M: <br />87.00 <br />UNIT $: <br />$6,264.00 <br />EXT. $: <br />RR Flagman 25 day(s) 825.00 $20,625.00 <br />INSPECTION SERVICES Sub TOTAL: $26,889.00 <br />C) FURNISHED MATERIALS <br />REF DESCRIPTION: QTY: U /M: UNIT $: EXT. $: <br />56 fiber dispersion shifted armored cable 7300 ft. 0.75 $5,475.00 <br />Signs, post, hardware 14 ea. 35.00 $490.00 <br />Handholes 2 ea. 775.00 $1,550.00 <br />Splice Materials Per Splice Location (216 or smaller) 2 ea 750.00 $1,500.00 <br />FURNISHED MATERIALS Sub TOTAL: $9,015.00 <br />D) CONTRACTOR UNIT PRICE SCHEDULE <br />REF DESCRIPTION: <br />QTY: U /M: <br />UNIT $: <br />EXT. $: <br />Place Conduit <br />756 If <br />45.00 <br />$34,020.00 <br />Place handhole <br />2 ea. <br />750.00 <br />$1,500.00 <br />Place Cable <br />6900 If <br />1.05 <br />$7,245.00 <br />Directional bore <br />5676 If <br />25.00 <br />$141,900.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.