Laserfiche WebLink
Page: 03 <br />OUTSIDE PLANT CONSTRUCTION <br />COST ESTIMATE (ACTIVE APPROVED) <br />09/24/2013 <br />Project/AFE #: R40024 -063 SAN MARCOS TX RCUP LOOP 82 BRIDGE Revision: 1 <br />Place buried cable markers & water crossing signs 14 ea. 45.00 $630.00 <br />Remove existing cable 6900 If 1.05 $7,245.00 <br />CONTRACTOR UNIT PRICE SCHEDULE Sub TOTAL: $192,540.00 <br />E) SPLICING LABOR <br />REF DESCRIPTION: QTY: U /M: UNIT $: EXT. $: <br />OPS Splicing Support 96 hrs 87.00 $8,352.00 <br />SPLICING LABOR Sub TOTAL: $8,352.00 <br />