My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-156/Approving a utility adjustment agreement w/MCI Communications Services, Inc. associated with the Loop 82 overpass project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-156/Approving a utility adjustment agreement w/MCI Communications Services, Inc. associated with the Loop 82 overpass project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2014 10:26:02 AM
Creation date
10/22/2013 10:03:11 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-156
Date
10/15/2013
Volume Book
200
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MCI OUTSIDE PLANT FOCUS <br />FIBER OPTIC CABLE UNCOVERING SYSTEM <br />1. THE TITLE OF THIS PROGRAM, F.O.C.U.S., AN ACRONYM FOR "FIBER OPTIC CABLE UNCOVERING <br />SYSTEM," WAS SELECTED TO REMIND EVERYONE INVOLVED WITH WORKING NEAR MCI'S ACTIVE FIBER <br />OPTIC SYSTEMS TO FOCUS ON PROTECTING THE FACILITIES. IF, DURING THE COURSE OF THE PROJECT, <br />YOU NOTICE ANY ACTIVITY WHICH MAY JEOPARDIZE THE MCI OSP FACILITIES, IT IS YOUR DUTY TO STOP <br />THE WORK AND RE- F.O.C.U.S. <br />2. F.O.C.U.S. RULES MUST BE FOLLOWED ON ALL MCI PROJECTS INVOLVING WORK ON OR NEAR MCI OSP <br />FACILITIES. SAFETY IS MCI'S NUMBER ONE PRIORITY; EVERYONE MUST REFRAIN FROM UNSAFE AND <br />IMPROPER PRACTICES. <br />3. REVIEW OF F.O.C.U.S. IS MANDATORY AT EVERY PRE -BID, PRE - CONSRUCTION SITE MEETING AND DAILY <br />TAILGATE MEETING. F.O.C.U.S. DISCUSSION MUST INCLUDE SITE - SPECIFIC HISTORY, UNIQUE PROBLEMS, <br />FACILITY CONFIGURATIONS THAT MAY BE ENCOUNTERED, AND PAST ERRORS. "THOSE WHO DO NOT <br />LEARN FROM HISTORY ARE DOOMED TO REPEAT IT." DO NOT LET THIS HAPPEN TO YOU. <br />4. ANY WORK NEAR OR REQUIRING HANDLING OF MCI OUTSIDE PLANT FACILITIES CAN ONLY BE <br />PERFORMED WITH AN MCI EMPLOYEE OR CONTRACT REPRESENTATIVE PRESENT -- THIS MEANS OUT OF <br />HIS OR HER VEHICLE AND DIRECTLY MONITORING THE WORK. THE REPRESENTATIVE MUST HAVE A <br />PROPERLY OPERATING CABLE LOCATOR CHECKED FOR ACCURACY EVERY DAY PRIOR TO <br />COMMENCEMENT OF WORK (COMPARISON OF LINE AND DEPTH READINGS TO ACTUAL LINE AND DEPTH <br />OF THE CABLE). <br />5. LOCATE AND POTHOLE REQUIREMENTS: <br />• PRIOR TO ANY EXCAVATION, THE MCI EMPLOYEE OR CONTRACT REPRESENTATIVE MUST VERIFY THE <br />INITIAL LOCATE MARKS COMPLETED BY MCI OPERATIONS. DO NOT TRUST LOCATE RESULTS <br />COMPLETED BY OTHERS THE MCI OR CONTRACT REPRESENTATIVE MUST LOCATE THE CABLE <br />RUNNING LINE BY MAKING AT LEAST ONE PASS IN EACH DIRECTION. LOCATE RESULTS MUST THEN BE <br />COMPARED WITH PREVIOUS MARKS AND THE AS- BUILTS. <br />• IF THE PROPOSED WORK INVOLVES DIGGING OR EXCAVATING WITHIN 3 FEET OF THE CABLE, THE <br />CABLE ROUTE WILL BE MARKED CONTINUALLY WITH ORANGE PAINT AND SUPPLEMENTED BY <br />MARKER FLAGS PLACED EVERY 10 FT. THE EXCAVATION CONTRACTOR MUST POTHOLE (ALL <br />POTHOLES MUST BE COMPLETED BY HAND DIGGING OR VACUUM EXCAVATION) A MINIMUM OF <br />EVERY 15 FT., THEN EXPOSE THE ENTIRE LENGTH OF THE CABLE BY HAND DIGGING OR VACUUM <br />EXCAVATION. <br />• IF THE PROPOSED WORK INVOLVES DIGGING OR EXCAVATING WITHIN 5 FEET (BUT NOT CLOSER <br />THAN 3 FEET) OF THE CABLE, THE CABLE ROUTE WILL BE MARKED CONTINUALLY WITH ORANGE <br />PAINT AND SUPPLEMENTED BY MARKER FLAGS PLACED EVERY 10 FT. THE EXCAVATION <br />CONTRACTOR MUST POTHOLE THE CABLE A MINIMUM OF EVERY 15 FT. <br />• IF THE PROPOSED WORK INVOLVES DIGGING OR EXCAVATING WITHIN 5 FEET (BUT NOT CLOSER <br />THAN 3 FEET) OF THE CABLE, THE CABLE ROUTE WILL BE MARKED CONTINUALLY WITH ORANGE <br />PAINT AND SUPPLEMENTED BY MARKER FLAGS PLACED EVERY 10 FT. THE EXCAVATION <br />CONTRACTOR MUST POTHOLE THE CABLE A MINIMUM OF EVERY 15 FT. <br />• THE CABLE WILL ALSO BE POTHOLED AT ANY CHANGE IN THE RUNNING LINE OF MORE THAN 1 FT. <br />IN ANY DIRECTION, ANYTIME THE ACCURACY OF THE ELECTRONIC LOCATE IS QUESTIONED, OR <br />THE MARKED RUNNING LINE DOES NOT MATCH THE AS- BUILTS. <br />6. EXPOSING REQUIREMENTS: <br />• NO MECHANICAL EXCAVATION WITHIN 3 FT. OF OSP FACILITIES WILL BE ALLOWED UNLESS THE <br />FACILITIES HAVE FIRST BEEN PROPERLY LOCATED, POTHOLED, POSITIVELY IDENTIFIED, <br />CONTINUOUSLY EXPOSED BY HAND DIGGING OR VACUUM EXCAVATION, AND THE FACILITES ARE <br />CLEARLY VISIBLE. <br />• IN ADDITION, MECHANICAL EXCAVATION WITHIN 3 FT. OF OSP FACILITIES REQUIRES ON -SITE PRIOR <br />APPROVAL FROM MCI'S EMPLOYEE OR CONTRACT REPRESENTATIVE. <br />7. PLEASE REFER TO THE LATEST EDITION OF THE MCI OSP HANDBOOK FOR ADDITIONAL DETAILS. KNOW <br />IT AND FOLLOW IT. <br />MCI OUTSIDE PLANT CONSTRUCTION GENERAL REQUIREMENTS <br />ALL FEDERAL, STATE AND LOCAL SAFETY REGULATIONS MUST BE FOLLOWED <br />WITHOUT EXCEPTION. <br />• PERSONAL PROTECTIVE EQUIPMENT APPROPRIATE FOR THE SPECIFIC WORK SITE <br />SHALL BE USED AT ALL TIMES. AT A MINIMUM, HARD HAT, SAFETY SHOES /STEEL -TOED <br />BOOTS, AND FLORESCENT ORANGE OR GREEN WORK VEST ARE REQUIRED UPON <br />ENTERING ANY MCI WORK SITE. <br />USE OF INTOXICANTS, DRUGS, INHALANTS OR ANY OTHER SUBSTANCES THAT MAY <br />IMPAIR ALERTNESS ARE STRICTLY PROHIBITED. <br />CONTRACTORS ARE NOT ALLOWED TO CUT ANY CABLE. CABLES SCHEDULED FOR <br />REMOVAL WILL BE CUT BY MCI OPERATIONS PERSONNEL, AND ONLY AFTER <br />VERIFICATION THAT ALL TRAFFIC HAS BEEN OFF - LOADED. <br />• EXTREME CAUTION MUST BE USED AT ALL TIMES WHEN WORKING ON OR NEAR <br />ACTIVE CABLES. AN MCI EMPLOYEE OR CONTRACT REPRESENTATIVE MUST <br />APPROVE AND BE PRESENT PRIOR TO AND DURING ALL CABLE HANDLING <br />ACTIVITIES. <br />TOOLS AND EQUIPMENT SPECIFICALLY DESIGNED FOR THE JOB AT HAND ARE <br />REQUIRED. USE THE PROPER TOOL FOR THE JOB. <br />• CONDUIT WORK INVOLVING ACTIVE CABLES REQUIRES SPECIALIZED TOOLS <br />SPECIFICALLY DESIGNED TO ACCESS DUCTS WITH ACTIVE CABLES. <br />PROTECTING MCI FACILITIES IS EXTREMELY IMPORTANT; HOWEVER, SAFETY <br />REGARDING YOURSELF AND OTHERS IS THE MOST IMPORTANT PART OF ANY <br />PROJECT. <br />PROJECT: R40024 -063 <br />SAN MARCOS, TX <br />RCUP LOOP 82 BRIDGE <br />U <br />Z Z <br />U) 0 w <br />Lu <br />U T_ p o <br />> F <br />w Z CJ m <br />(n O ~ (V <br />U U 0O co <br />Z <br />�O z or O <br />W <br />P- Q m <br />U a 1 <br />W Z) <br />Z <br />w U <br />Z) �_ Of <br />2 <br />O <br />O <br />Q <br />DATE: 5 -15 -13 <br />ENGINEER: DOUG KOUGL <br />DRAWN BY: G.F.S. (TJS) <br />REVISIONS <br />DATE DESCRIPTION INITIAL <br />EXCEPT AS MAY BE OTHERWISE PROVIDED BY <br />CONTRACT, THESE DRAWINGS AND SPECIFICATIONS <br />SHALL REMAIN THE PROPERTY OF MCI <br />COMMUNICATIONS SERVICES INC. BOTH BEING <br />ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE <br />REPRODUCED. COPIED, OR USED FOR ANY <br />PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION. <br />SCALE <br />HORIZONTAL: 1 "= N/A <br />VERTICAL: 1 "= N/A <br />MP TO MP <br />SHEET 4A OF 19 <br />FILE: R40024- 06301004 BC.R &U <br />
The URL can be used to link to this page
Your browser does not support the video tag.