Laserfiche WebLink
UNION PACIFIC RAILROAD GENERAL NOTES <br />GENERAL NOTES <br />1. FIBER OPTIC INSTALLATION ON UNION PACIFIC RAILROAD SHALL <br />CONFORM TO THE UNION PACIFIC MANUAL "FIBER OPTIC ENGINEERING, <br />CONSTRUCTION AND MAINTENANCE STANDARDS ", LATEST EDITION. <br />2. ALL WORKERS ON RAILROAD PROPERTY MUST BE UNION PACIFIC RAILROAD <br />SAFETY TRAINED AND WEAR RAILROAD APPROVED PERSONAL PROTECTIVE <br />EQUIPMENT. <br />3. PRIOR TO ANY <br />EXCAVATION ON UNION PACIFIC RIGHT <br />OF WAY, <br />IT IS <br />MANDATORY TO <br />CALL UNION PACIFIC'S "CALL BEFORE <br />YOU DIG" <br />NUMBER, <br />1- 800 - 336 -9193, <br />TO ASCERTAIN IF ANY FIBER OPTIC <br />CABLES <br />EXIST IN THE <br />PROJECT AREA. <br />THIS MUST BE DONE A MINIMUM OF 48 HOURS <br />PRIOR TO ANY <br />CONSTRUCTION <br />ACTIVITY, THIS IS IN ADDITION TO ANY <br />STATE ONE —CALL <br />NOTIFICATIONS. <br />H <br />u; <br />IMPALING HAZARDS, OR IN A LOCATION THAT OBSTRUCTS RAILROAD <br />cn o <br />U <br />4. DIRECTIONAL BORES MUST BE APPROVED PRIOR TO CONSTRUCTION. <br />5. TRACK BORES MUST BE CASED IF LESS THAN TEN FEET BELOW THE BASE OF <br />THE RAIL. ALL MULTIPLE —DUCT BORES MUST BE CASED. THE CASING MUST <br />EXTEND A MINIMUM OF 30 FEET FROM THE CENTERLINE OF THE NEAREST <br />TRACK WHEN MEASURED AT RIGHT ANGLES TO THE TRACK. <br />6. NO EXCAVATION IS ALLOWED WITHIN 12 FEET OF ANY TRACK. ALL <br />EXCAVATIONS MUST BE SHORED IN ACCORDANCE WITH OSHA STANDARDS. <br />SHORING FOR EXCAVATIONS ON RAILROAD RIGHT —OF— WAY MUST BE APPROVED <br />BY THE VP ENGINEERING. <br />7. BORE PITS ARE TO BE LOCATED A MINIMUM OF 30 FEET FROM THE <br />CENTERLINE OF THE NEAREST TRACK WHERE POSSIBLE. BORE PITS ARE NOT <br />ALLOWED IN THE CUT OR FILL SECTIONS OF THE ROADBED. <br />8. TRENCHES AND BORE PITS ARE TO BE FILLED OR FENCE — PROTECTED AT THE <br />END OF EACH DAY. <br />9. EXCAVATIONS ARE TO BE FILLED AND COMPACTED TO MATCH NATURAL <br />CONDITIONS OF THE SURROUNDING AREA. <br />10. DO NOT FOUL THE BALLAST. KEEP ALL DIRT AND OTHER FOREIGN MATERIALS <br />OUT OF THE TRACK BALLAST SECTION. <br />11. THE RIGHT —OF —WAY SHALL BE RESTORED TO ITS ORIGINAL CONDITION OR <br />BETTER, INCLUDING SEEDING WITH NATIVE GRASSES. <br />12. CABLE SHALL BE INSTALLED A MINIMUM OF 42" BELOW NATURAL GROUND. <br />THIS DEPTH SHALL INCREASE TO 60" UNDER TRACKS (DRY BORE ONLY), <br />CULVERTS AND DITCHES. <br />verinbusiness <br />PROJECT: R40024 -063 <br />SAN MARCOS, TX <br />RCUP LOOP 82 BRIDGE <br />13. HANDHOLES, SPLICE BOXES AND MANHOLES MUST BE DESIGNED FOR AASHTO <br />H -20 LOADING AND MUST BE INSTALLED SO AS NOT TO CREATE A <br />z <br />STUMBLING HAZARD. <br />z <br />o <br />w <br />u w <br />w <br />14. MARKER POSTS MUST BE INSTALLED SO AS NOT TO CREATE STUMBLING OR <br />> � <br />W Z <br />0 <br />m <br />H <br />u; <br />IMPALING HAZARDS, OR IN A LOCATION THAT OBSTRUCTS RAILROAD <br />cn o <br />U <br />n- o <br />o <br />OPERATIONS. <br />20 z <br />w °o <br />< <br />J <br />m J <br />0 <br />cn <br />15. CREEK BEDS THAT HAVE BEEN PLOWED OR CUT MUST BE RESTORED AND <br />z w <br />z <br />-1 0 <br />PROTECTED BY RIP RAP OR OTHER RAILROAD APPROVED EROSION CONTROL <br />PROCEDURES. <br />O ° <br />U <br />16. ANY DEVIATIONS FROM THE APPROVED PLANS MUST BE APPROVED BY THE <br />UP CONSTRUCTION COORDINATOR ASSIGNED TO THE PROJECT, ALL CHANGES DATE: 5-15-13 <br />ENGINEER: R: D DOUG KOUGL <br />MUST BE RECORDED ON THE AS —BUILT PLANS. DRAWN BY: G.F.S. (TJS) <br />REVISIONS <br />17. THE CABLE MUST BE LOCATED ON THE FIELD SIDE OF THE RAILROAD DATE DESCRIPTION INITIAL <br />FACILITIES. <br />18. INSTALLATIONS NEAR RAILROAD SIGNAL FACILITIES WILL REQUIRE <br />COORDINATION THROUGH THE UP CONSTRUCTION COORDINATOR WITH THE UP <br />SIGNAL DEPARTMENT. SIGNAL DEPARTMENT PERSONNEL WILL REMOVE AND EXCEPT AS MAY BE OTHERWISE PROVIDED BY <br />CONTRACT, THESE DRAWINGS PROP SPECIFICATIONS <br />REPLACE ALL GUY WIRES ATTACHED TO RAILROAD POLE LINES. <br />SHALL REMAIN THE PROPERTY OF MCI <br />COMMUNICATIONS SERVICES INC. BOTH BEING <br />ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE <br />REPRODUCED. COPIED, OR USED FOR ANY <br />PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION. <br />SCALE <br />HORIZONTAL: 1 "= N/A <br />VERTICAL: 1 "= N/A <br />MP TO MP <br />SHEET 413 OF 19 <br />FILE: R40024- 06301004CC.R&U <br />