Laserfiche WebLink
Page: 01 <br />OUTSIDE PLANT CONSTRUCTION <br />COST ESTIMATE (ACTIVE APPROVED) <br />06/07/2013 <br />Project /AFE #: R40024 -063 <br />Revision: 1 <br />Date Prepared: <br />02/15/2013 <br />Title <br />SAN MARCOS TX RCUP LOOP 82 BRIDGE <br />Engineer: <br />JOHN KOUGL <br />Site Code: <br />SMFBTX <br />Manager: <br />MARTIN SCHMIDT <br />Investigation #: <br />974 -2012 <br />City: <br />SAN MARCOS <br />Disposition: <br />REFUNDABLE CUP <br />State: <br />TX <br />Footage Impact: <br />5,676 <br />DESCRIPTION OF WORK <br />TXDOT in partnership with the City of San Marcos will be creating a grade separation, building a road bridge, where State Road Loop 82 crosses the UPRR in San <br />Marcos, TX. The MCI LID cable is in conflict with the bridge support structure and will need to be relocated. This project will require Verizon to install 6,432 feet of new <br />conduit, place approximately 6,800 feet of new 56 -fiber cable and create 1 new splice point. All of the work will be within the UPRR right -of -way. <br />Eng. Start: 04/08/2013 <br />Eng. Complete: 06/07/2013 <br />SCHEDULE <br />Const. Start: 07/22/2013 <br />Const. Complete: 09/23/2013 <br />SUMMARY OF ESTIMATED COSTS <br />A): ENGINEERING: <br />$29,373.60 <br />B): INSPECTION SERVICES: <br />$26,889.00 <br />C): FURNISHED MATERIALS: <br />$9,015.00 <br />D): CONTRACTOR UNIT PRICE SCHEDULE: <br />$192,540.00 <br />E): SPLICING LABOR: <br />$8,352.00 <br />F): TOTAL: <br />$266,169.60 <br />Construction Manager: Date: <br />