Laserfiche WebLink
Page: 02 <br />OUTSIDE PLANT CONSTRUCTION <br />COST ESTIMATE (ACTIVE APPROVED) <br />06/07/2013 <br />Project /AFE #: R40024 -063 SAN MARCOS TX RCUP LOOP 82 BRIDGE Revision: 1 <br />A) ENGINEERING <br />INTERNAL - REF DESCRIPTION: <br />QTY: U /M: <br />UNIT $: <br />EXT. $: <br />OSP Engineers <br />Documentation <br />ROW Labor <br />CONTRACT - REF DESCRIPTION: <br />248 hrs <br />4 hrs <br />8 hrs <br />QTY: U /M: <br />87.00 <br />87.00 <br />87.00 <br />UNIT $: <br />$21,576.00 <br />$348.00 <br />$696.00 <br />EXT. $: <br />Project Management (w /o inspection) - Metro - >500 <br />Cable Design - Metro Underground - >2,500 ft <br />6432 ft. <br />6432 ft. <br />ENGINEERING Sub TOTAL: <br />0.35 <br />0.70 <br />$2,251.20 <br />$4,502.40 <br />$29,373.60 <br />B) INSPECTION SERVICES <br />INTERNAL - REF DESCRIPTION: <br />QTY: U /M: <br />UNIT $: <br />EXT. $: <br />OPS Inspection (RMOD) <br />EXTERNAL - REF DESCRIPTION: <br />72 hrs <br />QTY: U /M: <br />87.00 <br />UNIT $: <br />$6,264.00 <br />EXT. $: <br />RR Flagman <br />25 day(s) <br />825.00 <br />$20,625.00 <br />INSPECTION SERVICES Sub TOTAL: <br />$26,889.00 <br />C) FURNISHED MATERIALS <br />REF DESCRIPTION: <br />QTY: U /M: <br />UNIT $: <br />EXT. $: <br />56 fiber dispersion shifted armored cable 7300 ft. <br />Signs, post, hardware 14 ea. <br />Handholes 2 ea. <br />Splice Materials Per Splice Location (216 or smaller) 2 ea. <br />0.75 <br />35.00 <br />775.00 <br />750.00 <br />$5,475.00 <br />$490.00 <br />$1,550.00 <br />$1,500.00 <br />FURNISHED MATERIALS Sub TOTAL: <br />$9,015.00 <br />D) CONTRACTOR UNIT PRICE SCHEDULE <br />REF DESCRIPTION: <br />QTY: U /M: <br />UNIT $: <br />EXT. $: <br />Place Conduit <br />Place handhole <br />Place Cable <br />Directional bore <br />756 If <br />2 ea. <br />6900 If <br />5676 If <br />45.00 <br />750.00 <br />1.05 <br />25.00 <br />$34,020.00 <br />$1,500.00 <br />$7,245.00 <br />$141,900.00 <br />