Laserfiche WebLink
Page: 03 <br />Project /AFE #: R40024 -063 <br />OUTSIDE PLANT CONSTRUCTION <br />COST ESTIMATE (ACTIVE APPROVED) <br />06/07/2013 <br />SAN MARCOS TX RCUP LOOP 82 BRIDGE Revision: <br />1 <br />Place buried cable markers & <br />Remove existing cable <br />water crossing signs 14 ea. <br />6900 If <br />45.00 <br />1.05 <br />$630.00 <br />$7,245.00 <br />CONTRACTOR UNIT PRICE SCHEDULE Sub TOTAL: <br />$192,540.00 <br />E) SPLICING LABOR <br />REF DESCRIPTION: <br />QTY: U /M: <br />UNIT $: <br />EXT. $: <br />OPS Splicing Support <br />96 hrs <br />87.00 <br />$8,352.00 <br />SPLICING LABOR Sub TOTAL: <br />$8,352.00 <br />