Laserfiche WebLink
<br />The Engineer shall monitor and review results of testing laboratories <br />as customarily required for similar projects. <br /> <br />1.3.12 <br /> <br />The Engineer shall review in detail and make all decisions <br /> <br />regarding the approval or taking of other appropriate action upon the <br />Contractor's submittals, including but not limited to, shop drawings, <br /> <br />catalog data and samples, <br /> <br />schedules, <br /> <br />and laboratory , <br /> <br />shop and mill <br /> <br />tests of material, equipment, <br /> <br />software docu11\entation and other data <br /> <br />submi tted by Contractor. <br /> <br />Such action shall be taken with reasonable <br /> <br />promptness, <br /> <br />but generally not to exceed fifteen <br /> <br />(15) <br /> <br />days or such <br /> <br />period of time which will not cause delay of the project(s). <br /> <br />1. 3 . 13 <br /> <br />The Engineer shall prepare Change Orders for the Owner's <br /> <br />approval and execution in accordance with the construction contract <br />documents, but shall not issue change orders not previously approved in <br /> <br />writing by Owner, and no course of conduct on the part of Engineer or <br /> <br />Owner shall act to amend, waive or alter this provision. <br /> <br />If additive <br /> <br />Change <br /> <br />Orders <br /> <br />are <br /> <br />required <br /> <br />as <br /> <br />a <br /> <br />result <br /> <br />of <br /> <br />any <br /> <br />error(s) <br /> <br />and/or <br /> <br />omission(s) of Engineer as determined by Owner, Engineer shall, within <br /> <br />thirty <br /> <br />(30) <br /> <br />days <br /> <br />of <br /> <br />receipt <br /> <br />of <br /> <br />an <br /> <br />invoice <br /> <br />therefor <br /> <br />from Owner, <br /> <br />reimburse Owner in an amount equal to ten percent (10%) of the amount <br />of the additive change order but only to the extent that the cumulative <br /> <br />total <br /> <br />of <br /> <br />such <br /> <br />change <br /> <br />orders <br /> <br />exceeds <br /> <br />three <br /> <br />percent <br /> <br />(3%) <br /> <br />of <br /> <br />the <br /> <br />construction cost. <br /> <br />1. 3 . 14 <br /> <br />The <br /> <br />Engineer <br /> <br />shall <br /> <br />conduct <br /> <br />professional <br /> <br />inspections. <br /> <br />to <br /> <br />determine the Dates of Substantial Completion and final completion, to <br />evaluate the Work for acceptable conformance with the construction <br /> <br />contract documents and in light of any subsequent tests performed as <br /> <br />-9- <br />