My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1988-096
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1988
>
Res 1988-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2007 10:51:59 AM
Creation date
8/10/2007 10:51:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1988-96
Date
9/12/1988
Volume Book
92
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~.5 <br /> <br />TDIB <br /> <br />1.5.1 <br /> <br />The Enqineer shall submit to the Owner within 125 calendar <br /> <br />days <br /> <br />of <br /> <br />the <br /> <br />execution <br /> <br />of <br /> <br />this <br /> <br />contract, <br /> <br />the <br /> <br />preliminary <br /> <br />report <br /> <br />described in section 1.1 of this Aqreement, excludinq time required for <br /> <br />City reviews. <br /> <br />The final <br /> <br />construction contract documents <br /> <br />shall be <br /> <br />submitted within ~ calendar days of OWner's written authorization to <br /> <br />proceed with desiqn phase. <br /> <br />This <br /> <br />excludes time required <br /> <br />for City <br /> <br />reviews. <br /> <br />As <br /> <br />used <br /> <br />herein <br /> <br />the <br /> <br />term <br /> <br />"final" <br /> <br />construction <br /> <br />contract <br /> <br />documents, plans and specifications shall be interpreted to mean the <br />construction contract documents, plans and specifications as reviewed <br /> <br />and finally approved by the Owner. <br />ARTICLE 2 <br /> <br />THE OWNER'S RESPONSIBILJ:TIBS <br /> <br />2.1 <br /> <br />The <br /> <br />Owner <br /> <br />shall <br /> <br />provide <br /> <br />full <br /> <br />information <br /> <br />reqardinq <br /> <br />requirements for the project(s) includinq <br /> <br />Owner's desiqn objectives, <br /> <br />constraints <br /> <br />and <br /> <br />criteria, <br /> <br />includinq <br /> <br />space <br /> <br />requirements <br /> <br />and <br /> <br />relationships, <br /> <br />flexibility and expandability, <br /> <br />special equipment and <br /> <br />systems and site requirements. <br /> <br />2.2 <br /> <br />If the Owner provides a budqet for the project(s) it shall <br /> <br />include <br /> <br />continqencies <br /> <br />for <br /> <br />biddinq, <br /> <br />chanqes <br /> <br />in <br /> <br />the <br /> <br />Work <br /> <br />durinq <br /> <br />construction, <br /> <br />and other costs which are the responsibility of the <br /> <br />Owner, includinq those described in this Article 2 and in Subparaqraph <br /> <br />3.1.2. <br /> <br />The Enqineer shall accept the Owner's authorization to bid the <br /> <br />project(s) as evidence that arranqements exist for fulfillment of the <br />financial obliqations assumed by the Owner hereunder. <br /> <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.