My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1988-096
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1988
>
Res 1988-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2007 10:51:59 AM
Creation date
8/10/2007 10:51:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1988-96
Date
9/12/1988
Volume Book
92
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />cost may be increased by Owner. <br /> <br />Any such increase in the fixed limit <br /> <br />of construction cost shall not result in increased compensation to <br /> <br />Engineer. <br /> <br />3.1.4 <br /> <br />If the lowest bona fide bid exceeds the Fixed Limit of <br /> <br />Construction Cost established as a condi tion of this Agreement, <br /> <br />the <br /> <br />Owner shall (1) give written approval of an increase in such fixed <br /> <br />limit, <br /> <br />(2) <br /> <br />authorize rebidding or renegotiating of the project(s) <br /> <br />within a reasonable time, or (3) cooperate in revising the project(s) <br /> <br />scope and quality to reduce the Construction Cost. <br /> <br />services provided <br /> <br />by the Engineer regarding items <br /> <br />(2) <br /> <br />and ( 3 ) <br /> <br />above or other actions <br /> <br />requested by the Owner in writing shall be undertaken as an additional <br />service and as such compensation shall be in accordance with Section <br /> <br />12.2.1 hereof. <br /> <br />During the development of the project(s) through the <br /> <br />phases described by Article 1 of this Agreement and prior to final <br />approval of construction contract documents, plans and specifications <br /> <br />by <br /> <br />the <br /> <br />Owner, <br /> <br />the <br /> <br />Engineer <br /> <br />shall <br /> <br />monitor <br /> <br />the <br /> <br />estimated <br /> <br />probable <br /> <br />construction cost in <br /> <br />relation to the established fixed limit. <br /> <br />If necessary, the Engineer shall implement construction costs <br />savings measures or otherwise endeavor to limit probable construction <br /> <br />cost to the level of available funds set by the Owner. <br /> <br />ARTICLE 4 <br /> <br />PAYHENTS TO THE ENGIHEER <br /> <br />4.1. <br /> <br />PAYMEHTS ON ACCOUNT OF BASIC SERVICES <br /> <br />4.1.1 <br /> <br />Payments for Basic Services may be made to Engineer monthly <br /> <br />following receipt by Owner of <br /> <br />Engineer's monthly written progress <br /> <br />status report and invoice therefor as set forth in Article 12, less any <br />disputed amounts, pending resolution thereof. <br /> <br />-16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.