My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1988-096
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1988
>
Res 1988-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2007 10:51:59 AM
Creation date
8/10/2007 10:51:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1988-96
Date
9/12/1988
Volume Book
92
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Engineer's <br />described <br /> <br />Basic <br /> <br />Services <br /> <br />consist <br /> <br />of <br /> <br />the <br /> <br />following <br /> <br />phases <br /> <br />in <br /> <br />Paragraphs <br /> <br />1.1 <br /> <br />through <br /> <br />1.3 <br /> <br />and <br /> <br />include <br /> <br />normal <br /> <br />structural, mechanical and electrical engineering services. <br /> <br />0.1 <br /> <br />STAHDARDS OF PBRFORMAlfCB <br /> <br />0.1.1 <br /> <br />In the performance of all engineering services in connection <br /> <br />wi th this Agreement, the Engineer shall use that degree of care and <br /> <br />skill <br /> <br />ordinarily <br /> <br />exercised <br /> <br />for <br /> <br />similar projects <br /> <br />by <br /> <br />Engineers <br /> <br />who <br /> <br />possess special expertise in the type of work involved in this project. <br /> <br />1.1 <br /> <br />PRELDaHARY PHASE <br /> <br />Engineer shall: <br /> <br />1.1.1 <br /> <br />Attend one (1) meeting with City staff to evaluate needs of <br /> <br />staff, <br /> <br />system <br /> <br />characteristics <br /> <br />and <br /> <br />operations <br /> <br />and <br /> <br />maintenance <br /> <br />procedures. <br /> <br />1.1.2 <br /> <br />Review with owner alternative approaches and systems. <br />Establish scope of any soil and foundation investigations or <br /> <br />1.1.3 <br /> <br />any special surveys and tests which, in the opinion of the Engineer, <br />may be required. <br /> <br />1.1.4 <br /> <br />Arrange for, and attend, any manufacturers demonstrations of <br /> <br />equipment and software. <br /> <br />Such demonstrations may be limited to a single <br /> <br />day of presentation for all potential suppliers. <br /> <br />1.1.5 <br /> <br />Prepare a preliminary engineering report on the proj ect in <br /> <br />sufficient detail to clearly identify the needs of the system, the <br /> <br />operations and maintenance personnel, and public works administration <br /> <br />and present up to three ( 3 ) <br /> <br />al ternate systems and solutions to the <br /> <br />Owner, including preliminary layouts and cost estimates clearly stating <br />the Engineer's recommendations. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.