My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1988-096
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1988
>
Res 1988-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2007 10:51:59 AM
Creation date
8/10/2007 10:51:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1988-96
Date
9/12/1988
Volume Book
92
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1.2.6 <br /> <br />Prepare detailed cost estimates of authorized construction, <br /> <br />installation and training. <br /> <br />1.2.7 <br /> <br />Prepare and <br /> <br />furnish Owner <br /> <br />five <br /> <br />(5) <br /> <br />copies <br /> <br />of all <br /> <br />final <br /> <br />construction contract documents, <br /> <br />subj act to review and approval by <br /> <br />Owner. <br /> <br />After correction and/or revision, furnish the Owner twenty-five <br /> <br />(25) <br /> <br />copies of approved final construction contract documents. <br /> <br />All <br /> <br />sets in excess of twentY-five (25) are to be paid for by Owner at the <br /> <br />price <br /> <br />of <br /> <br />$75.00 per set. <br /> <br />Owner will distribute construction contract <br /> <br />documents and plans to potential bidders. <br /> <br />1.2.8 <br /> <br />Attend a pre-bid conference and answer questions of potential <br /> <br />bidders. <br /> <br />Engineer will <br /> <br />also issue all written addenda during the <br /> <br />bidding phase. <br /> <br />1.2.9 <br /> <br />If Owner chooses to separately bid out and purchase the <br /> <br />equipment and the installation of same, <br /> <br />Engineer shall prepare and <br /> <br />furnish Owner <br /> <br />five <br /> <br />(5) <br /> <br />copies <br /> <br />of <br /> <br />each <br /> <br />set <br /> <br />of <br /> <br />final <br /> <br />construction <br /> <br />contract documents subject to review and approval by Owner. <br /> <br />After <br /> <br />correction and/or revision, Engineer shall furnish the Owner thirteen <br /> <br />(13) <br /> <br />copies <br /> <br />of each set <br /> <br />of <br /> <br />approved <br /> <br />final <br /> <br />construction contract <br /> <br />documents. <br /> <br />All copies of each set in excess of thirteen (13) are to be <br /> <br />paid for by Owner at the price of $75.00 per set. <br /> <br />1..3 <br /> <br />BIDDING AND CONSTRUCTION PHASE <br /> <br />1.3.1 <br /> <br />Engineer shall prequalify Contractor, equipment, software and <br /> <br />hardware during the bidding period and shall <br /> <br />assist the Owner in <br /> <br />reviewing <br /> <br />the <br /> <br />statement <br /> <br />of <br /> <br />Bidder's <br /> <br />Qualifications, <br /> <br />financial <br /> <br />statements of bidders, lists of bidders' proposed subcontractors and <br />all other documents required to be submitted with the bids, and shall <br /> <br />make a recommendation to Owner regarding award of bid. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.