Laserfiche WebLink
<br />flows used to size the facilities for alternative 7 were based on the <br />projected population of the basin for the year 2020. <br /> <br />The first analysis of alternatives was completed for alternatives 1 <br />through 5. Based on the cost determinations in Appendix A through I, <br />it was first determined that alternative 2b was the recommended <br />alternative. Because the City later decided that the assumption of 100 <br />percent buildout for the two developments by the year 2005 was more <br />preferable,. alternative 6 was then derived (Appendix J). This <br />alternative was determined by resizing the facilities of alternative 2b to <br />comply with the revised flows. Therefore, alternative six is the <br />preferred alternative based on all evaluation factors. Henceforth, this <br />report refers to alternative 6 as the proposed alternative. <br /> <br />The total estimated cost of the proposed facilities to provide wastewater <br />transportation and treatment to the study area through the year 2005 is <br />approximately $ 12,624,329. The total estimated cost to Lowmans' Ranch <br />MUD is approximately $ 3,549, 95e, the total estimated cost to Cottonwood <br />Creek Park is approximately $ 590,476, and the total cost to San Marcos <br />is $ 8,483,520. As development proceeds, the proposed system should <br />be reevaluated to reflect actual conditions experienced. <br /> <br />JONES ð: NEUSE <br /> <br />2 <br />