Laserfiche WebLink
<br /> TABLE 6 <br /> ALLOCATION OF LINEWORK COSTS <br /> INCLUDES ENGINEERING AND CONTINGENCY (30%) <br /> LOWMAN COTTON SAN LO DAN COTTON SAN <br />PIPE RANCH CR PARK MARCOS RANCH CR PARK MARCOS <br />NO. , !Ii !Ii ---L- --Ì- ---L- <br /> <br />1 76 12 12 91,448 14,692 14,110 <br />2 69 11 19 146,004 23,456 40,749 <br />3 68 11 21 221,515 35,588 70,108 <br />4 66 11 23 180,341 28,973 63,037 <br />5 66 11 23 98,047 15,752 34,271 <br />7 100 0 0 244,140 <br />8 100 0 0 210,600 <br />9 100 0 0 115,050 <br />10 100 0 0 170,560 <br />11 100 0 0 183,300 <br />12 100 0 0 225,030 <br />13 100 0 0 139,750 <br />FM-1 33 5 62 257,400 39,{)OO 483,600 <br />FM-2 0 0 100 0 0 959,400 <br /> SUBTOTAL 994,754 157,460 2,953,705 <br /> <br />JONES III NEUSE <br /> <br />28 <br />