Laserfiche WebLink
<br />In phase II the central lift station is proposed to be upgrade to pump <br />the two-hour peak wet weather flow for the entire basin for the year <br />1995. An additional force main line is proposed to be constructed <br />parallel to the existing force main running from the central lift station <br />to the existing WWTP. This additional line should upgrade the total <br />capacity of the force mains to enable them to carry the two-hour peak <br />wet weather flow for the entire basin for the year 2005 at no more <br />than 5 feet per second. Also in phase II the existing WWTP is <br />proposed to be upgraded to enable it to treat the additional average <br />dry weather flow for the entire basin for the year 1995. <br /> <br />In phase III the central lift station is proposed to be upgraded to <br />pump the two-hour peak wet weather flow for the entire basin for the <br />year 2005. The eastern lift station is also to be upgraded in phase <br />III to enable it to pump the two-hour peak wet weather flow for <br />su b- basins 3- 5 for the year 2005. The existing WWTP is proposed to <br />be upgraded to enable it to treat the entire basins average dry <br />weather flow for the year 2005. <br /> <br />'- <br /> <br />JONES ð: NEUSE <br />