Laserfiche WebLink
<br />to a new manhole located Northwest of Hunter Road on the SAN MAR- <br />COS 186 179 acre tract. A plat showing the approximate layout of <br />said sewer line to be constructed is attached hereto as Exhibit D <br />and incorporated by reference herein. <br /> <br />Said construction contract will include the reworking <br />of the bottom of the existing ditch and easement area (relocation <br />of Willow Creek) along the ALEXANDER GROUP 67 acre tract and the <br />KROGER tract in accordance with the ditch profile and slope pre- <br />viously approved by CITY, a copy attached as Exhibit E, and the <br />stabilization of the reworked slope. <br /> <br />Said construction contract will be awarded by CITY not <br />later than 60 days after the completion of the engineering <br />design, plans and specifications, of the 18" sewer line by <br />ProTech Engineering Group, which design, plans and specifications <br />shall be completed in accordance with City of San Marcos standard <br />specifications on or before April 15, 1987. <br /> <br />Said construction contract will provide that the actual <br />construction work shall begin on the 18" sewer line on or before <br />July 15, 1987. However, in the event ProTech Engineering Group <br />fails to complete the design, plans and specifications for the <br />18" sewer line on or before April IS, 1987, then the time for the <br />beginning of construction under the contract awarded by the CITY <br />shall be extended one day for each additional day that the <br />completion of the design, plans and specifications is delayed <br />beyond April 15,1987. <br /> <br />4. That within 10 days of the execution of this con- <br />tract by CITY, ALEXANDER GROUP will deliver to CITY the originals <br />of the two previously executed utility easements granting an <br />easement to the City of San Marcos over the ALEXANDER GROUP 67 <br />acre tract and the KROGER tract (copies of said easements except <br />for signatures being attached hereto as Exhibit F and Exhibit G, <br />respectively) to be held in escrow by CITY in accordance with the <br />further provisions of this agreement. <br /> <br />5. That upon the awarding of the construction con- <br />tract by CITY, CITY will be authorized to record the two pre- <br />viously executed utility easements granting an easement to the <br />City of San Marcos over the ALEXANDER GROUP 67 acre tract and the <br />adjoining KROGER tract over the ditch forming the relocation of <br />Willow Creek on the ALEXANDER GROUP 67 acre tract and the adjoin- <br />ing KROGER tract. <br /> <br />6. That, by the acceptance of this agreement, and the <br />payment by SAN MARCOS 186 and S&S of the costs of the services of <br />ProTech Engineering as provided in this agreement, CITY acknow- <br />ledges that SAN MARCOS 186, 8&S, ALEXANDER GROUP and KROGER have <br />met all requirements for obtaining the extension of sewer service <br />to the SAN MARCOS 186 179 acre tract, the S&S 429 acre tract, the <br />ALEXANDER GROUP 67 acre tract, and the KROGER tract, by utiliza- <br />tionof said 18" sewer line described on Exhibit D attached <br />hereto and incorporated by reference herein. <br /> <br />7. That this contract is being executed by the <br />authorized representatives of S&S, SAN MARCOS 186, and ALEXANDER <br />GROUP, on the 9th day of February, 1987, and acceptance of said <br />contract by CITY is subject to formal approval by the City Coun- <br />cil of the City of San Marcos within 30 days from the date of <br />this agreement, that is, on or before March 11, 1987. <br /> <br />8. <br /> <br />Default: <br /> <br />1) In the event that CITY defaults under the <br />terms of this agreement after acceptance by the CITY of this <br />agreement as provided herein prior to the awarding of the con- <br />struction contract for the construction of the sewer line as <br />provided herein, then the two original easement documents held in <br />escrow shall not be recorded, but shall be returned to ALEXANDER <br />GROUP. <br />