Laserfiche WebLink
<br /> representation that the Engineer has made any examination to <br /> ascertain how and for what purpose the Contractor has used the <br /> monies paid on account of the Contract Sum. <br /> 1.4.9 The Engineer shall have authority to reject Work which <br /> does not conform to the Contract Documents. Whenever, in the <br /> Engineer's reasonable opinion, it is necessary or advisable for <br /> the proper implementation of the intent of the Contract Documents, <br /> and with the approval of the Owner, the Engineer will have <br /> authority to require special inspection or testing of the Work in <br /> accordance with the provisions of the Contract Documents, whether <br /> or not such Work be then fabricated, installed or completed. The <br /> Engineer shall monitor and review the work and results of all <br /> testing laboratories as required by Owner. <br /> 1.4.10 The Engineer shall review and make all decisions <br /> regarding the approval or taking of other appropriate action upon <br /> the Contractor's submittals such as Shop Drawings, Product Data <br /> and Samples, Schedule of Values and progress schedule. Such <br /> action shall be taken with reasonable promptness, but generally <br /> not to exceed fifteen (15) days, so as to cause no delay. <br /> 1.4.11 The Engineer shall prepare Change Orders for the Owner's <br /> approval and execution in accordance with the Contract Documents, <br /> but shall not issue change orders not previously approved in <br /> writing by Owner, and no course of conduct on the part of Engineer <br /> or Owner shall act to amend, waive or alter this provision. <br /> 1.4.12 The Engineer shall conduct professional inspections to <br /> determine the Dates of Substantial Completion and final <br /> completion, to evaluate the Work for general conformance with the <br /> Contract Documents and in light of any subsequent tests performed <br /> as described in Section 1.4.8 hereof, to verify that any minor <br /> deviations from the Contract Documents as described in Section <br /> 1.4.8 hereof have been corrected and that the reasons for any <br /> specific qualifications in any and all previous Certificates For <br /> Payment as described in Section 1.4.8 hereof are either no longer <br /> valid or the condition(s) and/or problem(s) have been corrected; <br /> shall receive and review written warranties and related documents <br /> -10- <br />