Laserfiche WebLink
<br /> 5.2. UNIVERSITY INTERCEPTOR <br /> 5.2.1 Preliminary Phase and Design Phase: For Services <br /> rendered as described under Section 1.2.1 Preliminary Phase, and <br /> 1.2.2 Design Phase, the Engineer shall be compensated for this <br /> work on the standard cost times multiplier basis as shown in <br /> Exhibit A, Schedule of Charges. Said fee shall not exceed <br /> Thirty-Seven Thousand Five Hundred Dollars ($37,500.00) if <br /> services rendered are for a Separate Project: or in an amount not <br /> to exceed Seventy-Four Thousand Dollars ($74,000.00) if services <br /> rendered are for a Combined Project or if Option I is chosen. <br /> The Engineer may submit monthly requests or billing for <br /> partial payment based on the amount of work completed. Said <br /> requests or billings shall be itemized on the basis of hours <br /> expended by position and shall include all other pertinent <br /> information. Payment shall become due and payable within thirty <br /> (30) days from receipt. <br /> 5.2.2 General Representation and Observation During <br /> Construction: For the services rendered as described under <br /> Section 1.4, Construction Phase, the Engineer shall be compensated <br /> for this work on the standard cost times multiplier basis as shown <br /> in Exhibit A, Schedule of Charges. Said fee shall not exceed <br /> Twenty-Two Thousand Dollars ($22,000.00) if services rendered are <br /> for a Separate Project; or in an amount not to exceed Thirty-Nine <br /> Thousand Dollars ($39,000.00) if services rendered are for a <br /> Combined Project or if Option I is chosen. <br /> The Engineer may submit monthly requests or billings for <br /> partial payment based on the amount of work completed. Said <br /> requests or billings shall be itemized on the basis of hours <br /> expended by position and shall include all other pertinent <br /> information. Payment shall become due and payable within thirty <br /> (30) days. <br /> 5.3 EASEMENTS FOR INTERCEPTOR <br /> 5.3.1 For services rendered as described under Section 12.1, <br /> Easements for Interceptor, the Engineer shall be compensated for <br /> this work on the standard cost times multiplier basis as shown in <br /> Exhibit A, Schedule of Charges. The Engineer shall provide the <br /> Owner with the estimated fee and any such work for said estimated <br /> -19- <br />