Laserfiche WebLink
;;; HALFF <br />• Wastewater design plan & profile sheets <br />• Decommissioning plan for two lift stations <br />• Standard details <br />Page 10 <br />1.3.2 Deliverables <br />• 2 half size sets, 1 PDF <br />• Opinion of Probable Construction Cost <br />1.4 90% Design Plans <br />1.4.1 Halff will address COSM comments from the 60% submittal and prepare the <br />90% design plans for the water and wastewater line improvements including the <br />following: <br />• General notes <br />• Quantities broken down by page <br />• Water design plan sheets (no profiles, a typical detail will be required for <br />utility crossings) <br />• Wastewater design plan & profile sheets <br />• Decommissioning plan for two lift stations <br />• Standard and special details <br />1.4.2 Deliverables <br />• 2 half size sets, 1 PDF <br />• Opinion of Probable Construction Cost <br />• Technical Specifications <br />1.5 100% Design Plans <br />1.5.1 Halff will address COSM comments from the 90% submittal and prepare the <br />100% design plans for the water and wastewater line improvements including the <br />following: <br />• General notes <br />• Quantities broken down by page <br />• Water design plan sheets (no profiles, a typical detail will be required for <br />utility crossings) <br />• Wastewater design plan & profile sheets <br />• Decommissioning plan for two lift stations <br />• Standard and special details <br />1.5.2 Deliverables <br />• 2 full size sets, 1 PDF, 1 CADD <br />• Opinion of Probable Construction Cost <br />• Technical Specifications <br />Old RR 12—Design—Option 1 <br />