Laserfiche WebLink
<br />TABLE I <br />PARTIAL LISTING OF COMPREHENSIVE WATER SYSTEM PLANS AND <br />WATER SYSTEM PROJECTS <br /> <br />Client Project Description Status <br /> <br />City of Buda Comprehensive Detailed preliminary engi- Completed <br />Water System neering report analyzing <br />Plan existing and future <br />needs of the City's water <br />supply and distribution <br />system. Included segment- <br />by-segment water demand <br />projections and computer <br />simulations of the water <br />distribution network to <br />determine optimum config- <br />uration and sizing of the <br />water supply and distribu- <br />tion system. <br /> <br />City of Iredell Water System Preliminary engineering report Completed <br />of current and future needs <br />of water supply, storage, <br />and distribution system. <br />Included water demand <br />projections and a segment- <br />by-segment analysis of sizing <br />requirements of water trans- <br />mission mains. <br /> <br />City of Orange Feasibility Analysis Preliminary engineering report Completed <br />for Water Storage including water demand projec- <br />Tank Relocation tions and computer simulations <br />of the water transmission <br />network to determine pressure <br />responses to peak demands <br />under various storage and <br />transmission configurations. <br /> <br />City of Nolanville* Community Preliminary engineering, design In-progress <br />Development and construction management <br />Grant of the extension of water <br />Project transmission mains, booster <br />pump station and relocated <br />facilities. <br /> <br />Cameron County* Water System Planning, design, and con- Complete <br />FWSD No.1 struction management of the <br />expansion of a water treatment <br /> <br /> <br /> <br /> <br /> <br /> <br />JONES Be NEUSE <br /> <br /> <br />6 <br />