My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-080
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2007 2:26:28 PM
Creation date
8/27/2007 2:26:28 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1986-80
Date
7/14/1986
Volume Book
80
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Client Project Description Status <br /> plant to 5 mgd, two raw <br /> water pumping stations, and <br /> approximately 30,000 L.F. <br /> of water transmission mains. <br /> City of Palacios* Water Supply, Planning, design, and construction Complet <br /> 'Storage, and management of a 500 gpm water <br /> Transmission well, 200,000 gallon elevated <br /> Mains storage tank, water transmission <br /> mains, and telemetry control <br /> system. <br /> City of Palacios Water Distribution Planning, design, and construction Com plet <br /> System management of approximately <br /> 20,000 LoF. of water distribution <br /> mains and related improvements. <br /> T~e Cliff Venture Cliffs of Surveying, platting, and design In-progress <br /> Canyon Creek of residential subdivision, <br /> Phase V and VI including water distribution system, <br /> sewer, streets, and drainage. <br /> City of Belton 1984 CIP Program Planning, design, construction In-progress <br /> Projects management, surveying, and other <br /> services for several projects involving <br /> water distribution, sewer, streets, <br /> and drainage. <br /> City of Sunset Valley 42-inch Water Construction inspection of 42-inch Complete <br /> Transmission Main water transmission main. <br /> I Wadsworth Water* Water System Preliminary engineering report Completed <br /> ' Supply Corp. for expansion to water system. <br /> <br /> American General Water System Preliminary engineering evaluation Completed <br /> Investment Corp. of alternatives for water supply system <br /> of new South Padre Island Development. <br /> Gulf Coast Niagra 1 Design of water well, storage, and Com pleted <br /> Utilities Subdivision distribution system. <br /> Gulf Coast Brazoria Bend Design of water well, storage and Completed <br /> Utilities Country Club distribution system <br /> Estates <br /> Gulf Coast Bayou Colony Design of water well, storage, and Com pleted <br /> Utilities Subdivision Water distribution system. <br /> System <br /> JONES 8: NEUSE <br /> <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.