Laserfiche WebLink
<br /> TABLE 3 <br /> PARTIAL LISTING OF COMPREHENSIVE PLANNING AND DESIGN <br /> WASTEWATER COLLECTION AND TREATMENT SYSTEMS <br /> Client Project Description Status <br /> City of Palacios Wastewater Planning, design, and Com plete <br /> Collection and construction management <br /> Treatment System of the expansion <br /> an existing wastewàter <br /> treatment plant to 800,000 <br /> gpd capaci ty, the rehabili ta- <br /> tion of the sanitary sewer <br /> collection system, and <br /> the rehabilitation and <br /> expansion of six waste- <br /> water pumping stations. <br /> Ci ty of Palacios Other Permit applications for In-Progress <br /> wastewater permit, munici- <br /> pal annexation, surveying, <br /> grant and loan applica- <br /> tions, rate studies and subdi- <br /> VISIon revenue. <br /> Cameron County Wastewater Planning, design, and Completed <br /> FWSD 111 Treatment construction management <br /> Plants of three wastewater <br /> treatment plants, approxi- <br /> mately 2.5 mgd capacity <br /> each. <br /> Cameron Co. South Padre Planning, design, and Com pleted <br /> FWSD 111 Island Sewer management of the waste- <br /> 1m provements water pumping station, <br /> Phase I 2.2 mgd and 3.5 mgd, force <br /> mains and related work <br /> such as permit appli- <br /> cations, rate studies, <br /> bond issue coordination, <br /> etc. <br /> City of Buda Wastewater Planning, design, and In progress <br /> Treatment management of a 150,000 <br /> Plant gpd wastewater treatment <br /> plant, pump station, <br /> force mains and related <br /> JONES 8< NEUSE <br /> <br /> 9 <br />