Laserfiche WebLink
<br /> Client Project Description Status <br /> <br /> items of work such as <br /> processing wastewater <br /> permit applications and <br /> loan and grant appli- <br /> cation. <br /> City of Orange Wastewater Design, construction In progress <br /> Treatment management, and inspec- <br /> Plant tion services for <br /> expansion of two waste- <br /> water treatment plants, <br /> lift stations and <br /> assembled force mains and <br /> rehabilitation of existing <br /> collection system. <br /> City of Port Arthur Construction Planning reports, In progress <br /> Grant coordination of EPA <br /> Optimization funded wastewater pro- <br /> ject and related work. <br /> City of Iredell Wastewater Construction management Completed <br /> System of 50,000 gpd waste- <br /> water treatment plant <br /> and new wastewater col- <br /> lection system. <br /> .. Projects including formal environmental assessments. <br /> Several staff members of Jones and Neuse, Inc. were directly responsible for administering <br /> the EPA federally funded municipal facility construction grants program for the Texas <br /> Department of Water Resources. The program included all aspects of technical and environ- <br /> mental review and construction management and inspection of over 230 wastewater treat- <br /> ment and collection system projects in excess of 2.0 billion dollars in construction cost over <br /> a seven year period from 1978 to 198.5. <br /> JONES ð: NEUSE <br /> <br /> 10 <br />