Laserfiche WebLink
<br /> 1.5.3 The ARCHITECT shall be a representative but not an agent of <br /> the OWNER during the Construction Phase, ana shail consult with the <br /> OWNER and provide aavJ..ce, J..f any, to OWNER in writing. OWNER I S <br /> instructJ..ons to the Contractor shall De forwarded through the <br /> ARCHITECT, uniess ( 1) ARCHITECT is unavailaDie Dy telephonic <br /> communJ..cation or otherwJ..se to J..ssue instructJ..ons necessary for the <br /> proper progress ana acceptance of work; ( 2) when jeopardy to iJ..fe <br /> and/or property exJ..sts¡ ana/or ( 3) when lack of J..nstructJ..ons and/or <br /> unavaJ..laDJ..IJ..ty of ARCHITECT will result in, J..n OWNER's opJ..nJ..on, harm to <br /> OWNER, J..n which case instructJ..ons may be forwarded dJ..rectiy to the <br /> Contractor by OWNER. The ARCHITECT shail have authority to act on <br /> Deha~f of the OWNER only to the extent provided hereJ..n ana J..n the <br /> Contract Documents uniess otherwJ..se modified Dy wrJ..tten J..nstrument in <br /> accordance with Section 1.5.13. Any J..nstructions issued aJ..rectly by <br /> OWNER to Contractor shall be J..mrneaJ..ately cornmunJ..catea to ARCHITECT DY <br /> letter J..f the ARCHITECT was unavaiiaDle at the t un e of J..ssuance of <br /> J..nstructions. <br /> 1.5.4 The ARCHITECT shali conauct a pre-constructJ..on conference <br /> with the Contractor ana members of OWNER's staff as necessary ana sha~i <br /> make professJ..onai on-sJ..te inspections of the proJect(s) often enough to <br /> ensure fami~iarity WJ..th the progress and quality of the Work, to <br /> determJ..ne if the Work J..S proceeaJ..ng in acceptaDie conformance WJ..th the <br /> Contract Documents, ana to review the work wJ..th the OWNER's <br /> J..nspector. However, such inspectJ..ons shall not De iess than one (1) <br /> per week. On the Oasis of such on-sJ..te professional inspections as an <br /> archJ..tect, the ARCHITECT shall keep the OWNER informed of the progress <br /> ana quaiJ..ty of the Work. In performing these servJ..ces, the ARCHITECT <br /> wJ..lI endeavor to protect the OWNER against defects ana aefJ..cJ..encies J..n <br /> the quality ana quantity of the Work of the Contractor if such are <br /> wJ..thin its knowleage or shoula reasonably have oeen wJ..thin its <br /> knowiedge. <br /> 1.5.5 The ARCHITECT shall not have control or charge of and shail <br /> not be responsible for constructJ..on means, methoa s, technJ..ques, <br /> sequences or proceaures, or for safety precautions ana programs J..n <br /> connection WJ..th the Work, for the acts or OffiJ..SSJ..ons of the Contractor, <br /> Suo-contractors or any other persons performJ..ng any of the Work, or for <br /> the faJ..lure of any of them to carry out the Work in accordance wJ..th the <br /> -4- <br />