Laserfiche WebLink
<br />TABLE 9.1 (allTllIJED) <br /> <br />PROJECT <br /> <br />TOTAL <br />ESTIMATED <br />COST <br /> <br />LOCAL <br />FUNDS- <br /> <br />FAA <br />FUNDS <br /> <br />-------------------------------------------- ------------ ------------ ------------ <br />22. Construct New Maintenance Hangar $200.000 $200.000 $0 <br />23. Install PAP! (Runway 04-22) $120.000 $12.000 $108.000 <br />24. Construct Crash Fire Rescue Facility $90.000 $9.000 $81.000 <br />25. Construct/Repair Auto Parking. Access <br /> Roads $40.000 $40.000 $0 <br />26. I~rovements for Industrial Developlllent $175.000 $175.000 $0 <br />27. Removal. Repair. and Renovation of <br /> Facilities on Property Acquired from <br /> Gary Job Corps Center $40.000 $40.000 $0 <br />28. Runway and Parallel Taxiway Extension $280.000 $28.000 $252.000 <br /> (Runway 12-30) <br /> Contingencies and Engineering $306.400 $113.440 $192.960 <br /> <br />-------------------------------------------- ------------ ------------ ------------ <br /> Total Intenaediate Range $2.261.400 $862.440 $1.398.960 <br />-------------------------------------------- ------------ ------------ ------------ <br />29. Install New Aircraft Tie-downs. $9.000 $900 $8.100 <br />30. Construct New -T- Hangars $280.000 $280.000 $0 <br />31. Terlrtnal Building Expansion $100.000 $100.000 $0 <br />32. Construct Additional Maintenance <br /> Facilities $400.000 $400.000 $0 <br />33. Construct Additional FBO Facilities $150.000 $150.000 $0 <br />34. I~rov...nts for Industrial Development $210.000 $210.000 $0 <br />35. Relaval. Repair. and Renovation of <br /> Facilities on Property Acquired fro. <br /> Gary Job Corps Center $30.000 $30.000 $0 <br /> Contingencies and Engineering $183.840 $182.544 $1.296 <br /> <br />-------------------------------------------- ------------ ------------ ------------ <br /> <br />Total Long Range <br /> <br />$1.362.840 $1.353.444 <br /> <br />$9.396 <br /> <br />............................................ ............. ............ c...........~ <br /> <br />GRAND TOTAL <br /> <br />$6.626.840 $3.444.764 $3.182.076 <br /> <br />Can be accomplished utilizing City forces <br />** Note that -local funds. do not necessarily mean City funds - some facilities should <br />be constructed by private enterprise. <br /> <br />. <br /> <br />9.4 <br />