My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-106
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2007 4:45:19 PM
Creation date
8/27/2007 4:45:19 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
1986-106
Date
9/8/1986
Volume Book
82
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> TABLE 9.1 AIRPORT DEYElOPIEJIT SCHEIIULE <br /> TOTAL <br /> ESTIMATED LOCAL FAA <br /> PROJECT COST FUNDS- FUNDS <br />-------------------------------------------- ------------ ------------ ------------ <br />1. Overlay Runway 12-30 $980.000 $98.000 $882.000 <br />2. Seal Coat Runway 17-35 $40.000 $4.000 $36.000 <br />3. Install MIRL Runway 17-35 $75.000 $7 .500 $67 .500 <br />4. Seal Coat Runway 04-22 $50.000 $5.000 $45.000 <br />5. Seal Coat Runway 08-26 $50.000 $5.000 $45.000 <br />6. Overlay and Repair Parking Apron $200.000 $20.000 $180.000 <br />7. Construct New .T- Hangars $200.000 $200.000 $0 <br />8. Construct New Maintenance Hangar $280.000 $280.000 $0 <br />9. Install PAPI (Runway 12) $60.000 $6.000 $54.000 <br />10. Construct New Terminal Building $170.000 $17.000 $153.000 <br />11. I.,rove Fuel Storage Facilities $20.000 $2.000 $18.000 <br />12. I.,rove Airport Drainage $65.000 $6.500 $58.500 <br />13. Relocate Airport Access Road $200.000 $200.000 $0 <br />14. I.,rovements for Industrial Development $175.000 $175.000 $0 <br />15. R8IIOval. Repair and Renovation of <br /> Facilities on Property Acquired from <br /> Gary Job Corps Center $40.000 $40.000 $0 <br /> Contingencies and Engineering $397.600 $162.880 $234.720 <br />-------------------------------------------- ------------ ------------ ------------ <br /> Tota 1 Short Range $3.002.600 $1.228.880 $1.773.720 <br />-------------------------------------------- ------------ ------------ ------------ <br />16. Overlay Runway 04-22 $400.000 $40.000 $360.000 <br />17. Install MIRL Runway 04-22 $75.000 $7.500 $67.500 <br />18. Install Taxiway Edge Lighting <br /> (Runway 12-30) $20.000 $2.000 $18.000 <br />19. Overlay and Repair Apron $350.000 $35.000 $315.000 <br />20. Install New Aircraft Tie-Downs. $5.000 $500 $4.500 <br />21. Construct New .T. Hangars $160.000 $160.000 $0 <br /> 9.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.