My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 1986-123
San-Marcos
>
City Clerk
>
02 Ordinances
>
1980 s
>
1986
>
Ord 1986-123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2007 8:10:46 AM
Creation date
8/28/2007 8:10:46 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Emergency Approval
Number
1986-123
Date
9/22/1986
Volume Book
82
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> CITY OF SAN 1~COS <br /> ELECTRIC TARIFF <br /> ISSUED BY: SHEET NO. <br /> <br /> EFFECTIVE DATE: REVISION NO. <br /> <br /> SMALL GENERAL SERVICE <br /> RATE SCHEDULE - SGS <br /> The City shall charge and collect for small general service <br /> electric service on the basis of the provisions of this Rate <br /> Schedule - SGS. The Power Cost Adjustment Clause and Rules and <br /> Regulations for Electric Service are incorporated by reference as <br /> a part of this rate schedule. <br /> AVAILABILITY <br /> This rate schedule is available throughout the entire <br /> territory served by the City of San Marcos. <br /> APPLICABILITY <br /> This rate schedule is applicable to all electric service <br /> required for lighting, power and any other purpose, other than <br /> residential service as defined in Rate Schedule - RS, where the <br /> maximum metered demand in any month is less than 50 kW.. If the <br /> metered kWh exceeds 3,600 kWh for three consecutive months, the <br /> City may install demand metering equipment and transfer the <br /> customer to the then applicable general service rate schedule. <br /> Customers taking service under the LCRA Rate Schedule - SGS <br /> with maximum metered demands during any of the past twelve (12) <br /> billing months in excess of 10 kW may be transferred to the <br /> appropriate general service rate schedule when the City next <br /> adopts revised electric rate schedules. <br /> CHARACTER OF SERVICE <br /> Service under this rate schedule shall be alternating cur- <br /> rent, 60 Hertz, single phase, at the City's option of standard <br /> available voltages. The City may, at its option, provide three <br /> phase service when individual motors rated at 5.0 horsepower or <br /> larger are connected. Standby or resale service is not permitted <br /> under this rate schedule. <br /> MONTHLY RATE <br /> Customer Charge <br /> Single or Three Phase Service.....$ 8.75 <br /> Energy Charge: <br /> All kWh........................... $0.04432 per kWh <br /> FINAL DRAFT 9/5/86 - 4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.