Laserfiche WebLink
<br /> PARAGRAPH VI - (continued) <br /> underground from the base of the pole to the pump motors <br /> inside the fence and will be in accordance with the National <br /> Electrical Code for class I, Group D installation. The <br /> Contractor will quote as an alternate the deletion of piping <br /> and fittings from one of the 2,000 gallon tanks and the AVGAS <br /> skid. The contractor will also quote the price addition for <br /> adding an 115 volt electric rewind hose reel to the Jet skid. <br /> The reel will be as manufactured by Clifford B. Hannay and <br /> Son, Wester10, New York. Contractor will be responsible for <br /> for obtaining all required permits from the city of San Marcos. <br /> - NINE - <br />