Laserfiche WebLink
<br /> d1alatlon CqulþmE.nt Co., [/ nC!.. <br /> P. O. !Box 4 <br /> (214J 227-7218 J:ancaÛc.t, Clc.xa:1 75146 <br /> August 11, 1986 <br /> Mr. Jack Doughty <br /> Airport Manager <br /> City of San Marcos <br /> 630 E. Hopkins <br /> San Marcos, Texas 78666 <br /> Dear Mr. Doughty <br /> I trust you have received the plans and specifications <br /> which I sent you. In looking over the specifications I <br /> found several things that need to be added, if you send <br /> these out for bids" 'irhe additions are shown as amendment <br /> number one. <br /> When I gave my quote previously I did not include cost <br /> for doing the third tank or for adding a hose reel to the <br /> Jet skid or additional cost for perderna1es electric to set <br /> a new utility pole; therefore I am revising my quotation to <br /> $29,050.00 to include these features. <br /> Best Re~ards <br /> ~1tJ~~ <br /> Doug Garrison <br />