Laserfiche WebLink
<br />Effective: September 1, 1986rtevised Sheet No: 1 of 5 <br />EXHIBIT A of WHOLESALE POWER AGREEMENT DATED <br />Revisions of Sheet 1 and Total Maximum Demand Stated in Paraq~~Qh 1 of Sheet 2 <br /> <br />POINT OF DELIVERY <br />TO <br />CITY OF SAN MARCOS <br />(Di str ibuto£) <br /> <br /> Contract <br /> Delivery Load (KW) Estimated Contract Load (KW) <br /> Voltage Years Ending Years Ending June 25 <br />No. Location (Nominal) Phase 6-25-87 1988 1989 1990 1991 <br /> - - - <br />1 . Ranch Road 1 2 138 KV 3 10980 11650 12370 13130 13930 <br />2. Redwood 138 KV 3 16910 18010 23580 25110 26750 <br />3. San Marcos 138 KV 3 29780 31560 29050 30800 32640 <br />4. Hilltop 138 KV 3 14490 15360 16290 17260 18300 <br />TOTAL SAN MARCOS DELIVERY POINT 72160 76580 81 290 86300 91620 <br />Note: Point 1 is based upon winter peak load <br /> <br />Paragraph 1, page 2 of Exhibit A <br /> <br />Maximum Demand 91620 <br /> <br />LOWER COLORADO RIVER AUTHORITY: <br /> <br />: <br /> <br />. <br />. <br /> <br />ATTEST <br /> <br />By: <br />Ger1Eiral Manager <br /> <br />. <br />. <br /> <br />ATTEST: <br /> <br />By: <br /> <br />: <br /> <br />: <br /> <br />Date: <br /> <br />Date: <br /> <br />. <br />. <br />