My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-128
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2007 9:07:39 AM
Creation date
8/28/2007 9:07:39 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Purchase
Number
1986-128
Date
10/27/1986
Volume Book
83
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT A (Continued) <br /> <br />POINTS OF DELIVERY (continued) <br /> <br />1. <br /> <br />The Lower Colorado River Authority agrees to furnish <br /> <br />Distributor all of Distributor's power and energy <br /> <br />requirements at all Points of Delivery up to a maximum <br /> <br />demand of 91,620 Kw. <br /> <br />This maximum demand is based on a <br /> <br />five year estimate of Distributor's anticipated load <br /> <br />requirements and on the LCRA's projected capability. <br /> <br />Therefore, an annual review will be made of the <br /> <br />existing and projected capability of the LCRA, and the <br /> <br />estimated electric power and energy requirements of <br /> <br />Distributor, and based thereon the maximum number of <br /> <br />kilowatts (Kw) which LCRA will be required to furnish <br /> <br />Distributor at all Points of Delivery will be up-dated <br /> <br />and a revised Exhibit A will be prepared and placed in <br /> <br />effect. <br /> <br />2. <br /> <br />The contract load at each Point of Delivery for the <br /> <br />initial year and the estimated contract load for each <br /> <br />of the four succeeding years are set forth above. <br /> <br />Each <br /> <br />year prior to June 25th, LCRA and Distributor will <br /> <br />review Distributor's load requirements for each Point <br /> <br />of Delivery and, based on such review, will mutually <br /> <br />agree on the contract load for each Point of Delivery <br /> <br />for the succeeding year and the estimated contract load <br /> <br />for each of the succeeding four years. <br /> <br />A revised <br />
The URL can be used to link to this page
Your browser does not support the video tag.