My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-128
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2007 9:07:39 AM
Creation date
8/28/2007 9:07:39 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Purchase
Number
1986-128
Date
10/27/1986
Volume Book
83
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT A (Continued) <br /> <br />POINTS OF DELIVERY (Continued) <br /> <br />Exhibit A will than be prepared setting out the <br /> <br />contract load and the estimated contract loads as <br /> <br />agreed upon. <br /> <br />Should loads materially change at any <br /> <br />Point of Delivery, or if Distributor anticipates a <br /> <br />material increase in load requirements at any Point of <br /> <br />Delivery, written notice thereof will be given to LCRA <br /> <br />and upon mutual agreement a revised Exhibit A will be <br /> <br />prepared and placed in effect. <br /> <br />3. <br /> <br />The minimum monthly billing demand of 500 Kw provided <br /> <br />for in the Wholesale Power Rate Schedule WP-1 shall not <br /> <br />apply at Points of Delivery where noted. <br /> <br />4. <br /> <br />Where Distributor has other sources of electric power <br /> <br />and energy available to it, Distributor agrees that it <br /> <br />will purchase at least 100% of its total annual <br /> <br />electric power and energy requirements from LCRA. <br /> <br />LCRA <br /> <br />will attempt to use its best efforts to furnish any <br /> <br />increases in Distributor's <br /> <br />annual electric energy requirements in the same <br /> <br />percentage as above, provided that Distributor gives <br /> <br />LCRA timely notice of any increase in requirements of <br /> <br />electric power and energy so that LCRA may be prepared <br />
The URL can be used to link to this page
Your browser does not support the video tag.