Laserfiche WebLink
<br />Section No. <br />Section Title <br /> <br />EXHIBIT B (Continued) <br /> <br />Lower Colorado River Authority <br />P. O. Box 220 <br />Austin. Texas 78767 <br /> <br />ELECTRICAL TARIFF <br /> <br />4 Revision No. 6 <br />Ra~~ Schedules Replacing Sheet <br />Effective <br /> <br />Sheet No. <br />S Sheet No. <br /> <br />15 <br />15 <br /> <br />day <br /> <br />year <br /> <br />month <br /> <br />FUEL CHARGE <br /> <br />The following fuel charge per kilowatt hour (KWH) will be <br />multiplied by total kilowatthours and added to the energy <br />charge. <br /> <br />System Fuel Factor <br /> <br />$0.01664 <br /> <br />Voltage Level <br /> <br />Loss Multiplier <br /> <br />Transmission <br />(138 Kv or greater) <br /> <br />.9747 <br /> <br />Suç-Transrnission <br />(69 Kv) <br /> <br />.9917 <br /> <br />Primary <br />(Greater than 600v but <br />less than 69 Kv) <br /> <br />1.0064 <br /> <br />Secondary <br />(600 Volts & below) <br /> <br />1.0943 <br /> <br />PUSlIC UTlUTY COMMfSSIOH If TEXAS <br />APPROVED <br /> <br />JUl25 '86 ooau ~. f <br />IT <br />TARIFF CLER~ <br /> <br />Fuel Charge Per KWH <br /> <br />$ 0.01622 <br /> 0.01650 <br /> 0.01675 <br /> <br />0.018.21 <br />