Laserfiche WebLink
<br />A Guideline for due dates as specified on -Notices of Violation- <br /> <br />~ of Violation <br /> <br />Due Date <br />allotted times in days) <br /> <br />Group I - Facility Violations <br /> <br />A. <br />B. <br />C. <br /> <br />Install sample port clean-out <br />Install trap invert <br />Divert roof drains from discharging <br />to sanitary sewer <br />Diversion of other storm water from <br />sanitary sewer where new roofing or <br />land grading is required <br />Remove and replace defective clean- <br />out caps <br />Provide access to grease traps for <br />inspections <br />Install new grease traps, neutrali- <br />zation basins or other major pre- <br />treatment facility <br /> <br />." <br /> <br />30 <br />15 <br />15 <br /> <br />D. <br /> <br />30 <br /> <br />E. <br /> <br />3 <br /> <br />F. <br /> <br />5 <br /> <br />G. <br /> <br />Group II - <br /> <br />Discharge violations not likely to pose immediate <br />maintenance, safety, or treatment problems <br /> <br />A. <br />B. <br />C. <br />D. <br />E. <br /> <br />Animal and Vegetable oil or grease <br />Mineral oil <br />pH <br />Heavy metals <br />.Others. as indicated in the Industrial <br />Waste Ordinance Section <br /> <br />5 <br />5 <br />5 <br />5 <br />5 <br /> <br />Group III - <br /> <br />Discharge violations which are deemed <br />likely to pose immediate maintenance, <br />safety, or treatment problems <br /> <br />Any type of discharge as indicated in Group II, <br />but in excessive loading amounts <br /> <br />Immediately cease <br />discharge ."." <br /> <br />." Requires a compliance schedule to be submitted within 30 days. <br />."." The conditions of each such discharge shall be brought to the <br />immediate attention of the Environment and Engineering Division <br />Director or his appointed representative. <br /> <br />-65- <br />