My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-137
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2007 9:26:29 AM
Creation date
8/28/2007 9:26:29 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1986-137
Date
11/10/1986
Volume Book
84
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />29 <br /> <br /> This AGREEMENT is made this the 11 day of November <br />19 86 , between the CITY OF SAN MARCOS, TEXAS, hereinafter <br />referred to as "OWNER", 630 East Hopkins, San Marcos Texas 78666, <br /> <br />and <br /> <br />BYRN AND ASSOCIATES, INC. OF SAN MARCOS AND/OR AUSTIN TEXAS, <br /> <br />hereinafter referred to as "ENGINEER", for engineering services in <br /> <br />connection with the RECONSTRUCTION OF EAST BUGG LANE PROJECT. <br /> <br />WITNESSETH: <br /> <br />Owner and Engineer do hereby agree as follows: <br /> <br />ARTICLE 1 <br /> <br />ENGINEER1S SERVICES AND RESPONSIBILITIES <br /> <br />Engineer shall be responsible for the <br /> <br />proper, <br /> <br />accurate <br /> <br />and <br /> <br />adequate design of the following project: <br /> <br />Reconstruc"tion of East Bugg Lane from Highway 80 to <br />River Road with underground drainage structures <br />and improvements within the existing rights-of-way <br />and easements to the Blanco River. Pavement; <br />rignt-of-way and easement widths will be determined <br />during the Preliminary Conference with the Owner. <br /> <br />Engineer shall also be responsible <br /> <br />for <br /> <br />the <br /> <br />preparation <br /> <br />of <br /> <br />accurate <br /> <br />and <br /> <br />adequate <br /> <br />plans, <br /> <br />specifications, <br /> <br />reports and <br /> <br />Construction Contract Documents for the project(s), <br /> <br />and <br /> <br />any <br /> <br />provisions <br /> <br />in <br /> <br />this <br /> <br />Agreement pertaining to Owner's review <br /> <br />approval and/or acceptance of reports, plans, specifications, <br /> <br />Construction Contract Documents, or other <br /> <br />written <br /> <br />materials <br /> <br />prepared <br /> <br />by <br /> <br />Engineer <br /> <br />or <br /> <br />its consultants, contractors, and <br /> <br />subcontractors in connection with this project(s) <br /> <br />shall <br /> <br />not <br /> <br />be <br /> <br />deemed <br /> <br />to <br /> <br />diminish <br /> <br />Engineer's responsibility therefor. <br /> <br />The Engineer's Basic Services consist of the following phases <br /> <br />described in Paragraphs 1.1 through 1.5 <br /> <br />and <br /> <br />include <br /> <br />normal <br /> <br />civil and structural engineering services. <br /> <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.