Laserfiche WebLink
<br />0.1 <br /> <br />0.1.1 <br /> <br />shall <br /> <br />STANDARDS OF PERFORMANCE <br /> <br />All engineering services in <br /> <br />connection <br /> <br />with <br /> <br />this <br /> <br />contract <br /> <br />be <br /> <br />performed by the Engineer in accordance with the standard of <br /> <br />1.1 <br /> <br />care exhibited by large national engineering firms. <br /> <br />PRELIMINARY PHASE <br /> <br />1.1.1 <br /> <br />interested <br /> <br />Attend the preliminary conference with the <br /> <br />Owner <br /> <br />and <br /> <br />other <br /> <br />parties regarding the project to ascertain the requirements <br /> <br />of the Project, and Engineer shall review <br /> <br />the <br /> <br />understanding <br /> <br />of <br /> <br />such <br /> <br />requirements with the Owner. <br /> <br />1.1.2 <br /> <br />special <br /> <br />required. <br /> <br />done. <br /> <br />1.1.3 <br /> <br />required <br /> <br />Establish the scope of any soil and foundation investigation, <br /> <br />surveys, or tests which in the opinion of the Engineer, may be <br /> <br />Assist the Owner in selection and contracting for work to be <br /> <br />Establish the scope, and advise the Owner <br /> <br />field <br /> <br />of <br /> <br />surveys <br /> <br />is required for the design of the project. <br /> <br />to collect information which, in the opinion of the Engineer, <br /> <br />1.1.4 <br /> <br />sufficient <br /> <br />Prepare a preliminary engineering report on <br /> <br />the <br /> <br />project <br /> <br />in <br /> <br />detail <br /> <br />indicate <br /> <br />to <br /> <br />clearly the problems involved and the <br /> <br />recommended solution available <br /> <br />layouts, <br /> <br />to <br /> <br />the <br /> <br />including <br /> <br />Owner, <br /> <br />preliminary <br /> <br />drainage <br /> <br />calculations, <br /> <br />and <br /> <br />detailed <br /> <br />cost estimates. <br /> <br />Cost <br /> <br />1.1.5 <br /> <br />based on current area, volume or other unit costs. <br /> <br />1.2 <br /> <br />Furnish the Owner three (3) copies of the preliminary report. <br /> <br />DESIGN PHASE <br /> <br />1.2.1 <br /> <br />Establish the scope of any <br /> <br />additional <br /> <br />soil <br /> <br />and <br /> <br />foundation <br /> <br />investigations, <br /> <br />special <br /> <br />surveys, tests or field surveys, which in the <br /> <br />1.2.2 <br /> <br />opinion of the Engineer, may be required for design. <br /> <br />Department <br /> <br />Furnish <br /> <br />the <br /> <br />to <br /> <br />Owner <br /> <br />for <br /> <br />his <br /> <br />submittal <br /> <br />the <br /> <br />to <br /> <br />State <br /> <br />of <br /> <br />Highways and Public Transportation the engineering data <br /> <br />1.2.3 <br /> <br />and construction plans required for permits. <br /> <br />Engineering <br /> <br />Upon <br /> <br />receipt <br /> <br />Preliminary <br /> <br />of <br /> <br />written <br /> <br />approval <br /> <br />of <br /> <br />the <br /> <br />Report, Engineer shall prepare, for review and approval by <br /> <br />the Owner, Design Documents consisting of drawings and other <br /> <br />documents <br /> <br />to <br /> <br />fix and describe the size and character of the entire Project as to <br /> <br />civil and structural systems, materials, and such other elements as may <br /> <br />1.2.4 <br /> <br />be appropriate. <br /> <br />The <br /> <br />Engineer <br /> <br />shall <br /> <br />review <br /> <br />with <br /> <br />the <br /> <br />Owner <br /> <br />alternative <br /> <br />approaches to design and construction of the Project. <br /> <br />-2- <br />