My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1985-024
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1985
>
Res 1985-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2007 4:28:37 PM
Creation date
8/28/2007 4:28:37 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
1985-24
Date
3/11/1985
Volume Book
70
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> MARCOS <br /> , f¡¡¡rVr¡--II1, - !II <br />February 15,1985 <br />The first IGeeting with area developers was successful in generating <br />several alternatives to the problem of allocating remaining sewerage <br />capacity. Ho~..,eve r, since so much time was spent on developing the <br />ideas, we did not have sufficient time to generate any consensus as to <br />the best approach which could be presented to City Council for their <br />consideration. vIe have, therefore, called for a second meeting to be <br />held Thursday, February 2lst at 9:ØØ a.m., in City Hall Council <br />Chambers to continue the discussion. <br />To help organize your thoughts for the second meeting, the following <br />summary is provided. Seven basic parameters were presented which define <br />the problem. The solution to allocating remaining wastewater capacity <br />will have to address the concerns that: <br />1. The City Council will most likely be looking for a solution <br /> which will include developers fronting the expense of <br /> construction needed package plants; <br />2. For the good of the community, the solution should allow <br /> those who are prepared to develop to receive se\..¡erage <br /> allocations and proceed; <br />3. Any solution will only address wastewater system allocation <br /> and will not address any other concerns such as problems with <br /> zoning, platting, moratoriums, availability of utility lines, <br /> market forces, etc.; <br />4. The solution should not adversely impact those individuals <br /> who have already been given reservations; <br />city hall' 630 e. hopkins . san marcos, texas' 78666 . 512/353-4444 <br />
The URL can be used to link to this page
Your browser does not support the video tag.