My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1985-061
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1985
>
Res 1985-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2007 3:14:01 PM
Creation date
8/29/2007 3:14:01 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
Number
1985-61
Date
8/12/1985
Volume Book
72
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 2 <br />CITY San Marcos <br /> <br />3. Summarize the finances, public interest, anG! impact of major civic improvements recently <br />completed or currently planned in your community. <br />The City of San Marcos has recently completed a downtown <br />improvement project which included lighting, sidewalks, and <br />handicap ramps at a cost of $60,000 using CDBG monies. <br />Additional lighting for the downtown area has been purchased <br />and installation is planned for fiscal year 85-86. The <br />restoration of the only monument in town was accomplished <br />by the Heritage Association in 1981, at a cost of $5,000. <br />The Heritage Association also financed the restoration of <br />the Gazebo in Juan Verimendi Plaza, with the assistance of <br />the City. The Downtown Association of San Marcos provided <br />landscaping around the Courthouse Square by planting red <br />Crepemyrtle trees and flowers in the planter boxes. The <br />City of San Marcos is currently completing the restoration <br />of the Old Fish Hatchery Building, the Rio Vista Parks and <br />Recreation Building, and the Rio Vista Reserve Police Build- <br />ing at a cost of over $150,000. Another civic improvement <br />planned is the continuation of the River Walkway as a Ses- <br />quicentennial project. <br />4. What will be the long-term impaCt of this project after support from the Texas Main Street <br />Project is concluded? <br />The long term impact of the Texas Main Street Project support <br />will be the development of initiative and confidence from <br />the citizens of San Marcos that downtown can be an economic- <br />ally viable place to shop, work, and live. Once the restor- <br />ations begin on the historic structures, this confidence will <br />sprEad from business to business, from block to block, and so <br />on. As more people rediscover downtown, retail sales will <br />rise, properties will become more valuable, and a renewed <br />interest will spread throughout the city. While all this is <br />happening, a sense of pride in the downtown and the city as <br />a whole will be developing, and will last long after the Texas <br />Main Street Project has been concluded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.