My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 1985-117
San-Marcos
>
City Clerk
>
02 Ordinances
>
1980 s
>
1985
>
Ord 1985-117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2007 9:22:37 AM
Creation date
8/30/2007 9:22:37 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Emergency Approval
Number
1985-117
Date
11/25/1985
Volume Book
74
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> D. Residential land uses represent .3. 6. and t 7 LUEs per acre for <br /> low, medium, and hlgh density housing, respectively <br /> E. Comerc1al and índustríal1and uses represent 5 LUEs per acre <br /> 5. Pro jected wastewater flows for the service area were generated for <br /> 5-year, 10-year, 20-year planning horizons (years ending 1990, 1995, and <br /> 2005) and ultimate bui Idout based on the projected land use bui Idout <br /> schedu I es. <br /> 1he projected lUE. demands and wastewater nows for each p\anr\\nq <br /> horizon and for each entity are presented ln Table 3. <br /> 6. A preHmH¡ary design for facilities, including phasing of construcUon, <br /> was prepared in order to meet the projected wastewater demand for the <br /> 20-year planning horizon. The plan includes two gravity interceptors servtng <br /> both sides of IH 35 and a comb1ned 1nterceptor leading to the wastewater <br /> treatment plant site. Lift stations and force mains will be requlred to serve <br /> the areas west of IH 35 and within the North San Marcos Service Area, as we11 <br /> as the area to the south of the Municipal Airport The proposed treatment <br /> plant site is in the vic1njty of the murÜcipal a1rport on the unnamed tributary <br /> of the San Marcos River (see attached map). <br /> 7. Construction cost esUmates were calculated for each facility. 1he <br /> est imates were based on unlt costs for facUlty components 1n 1985 do11ars. <br /> Coot lngency costs of 15% and engineering costs of 10% of construct ion were <br /> lnc\uded. The specjflc facillties and their estlmated construcUon costs for <br /> the 5-year, 1 a-year and 20-year plannjng horizons are presented in Tables <br /> 4A, 4B, 4C and 5. <br /> The interceptor pipehne is to be installed at fun size initia11y to avoid <br /> the added cost of constructlng parallel rellef lines in the future. The <br /> wastewater treatment plant and lift stat10ns are to be built in phases, w1th <br /> additional capacity constructed every five to ten years. By 1995, 11ft <br /> <)t3t ions and force mains serving the Sink Creek basin and south of the <br /> wastewater treatment plant are to be constructed. The force mains serving <br /> these areas are to be oversized initially to avoid the added cost of parallel <br /> relief mains. <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.