Laserfiche WebLink
<br /> TABLE 5. AGGREGATE COST SUMMARY <br /> 1990 <br /> Construction cost $3,594,000 <br /> Contingencies( \ 5%) $5.39,100 <br /> Engineering( \ 0%) $413,310 <br /> TOTAL $4.546.410 <br /> 1995 <br /> Construction cost $3,448,500 <br /> Contingencies( 15%) $517,275 <br /> Engineering( 10%) $396,577 <br /> TOTAL $4.362.352 <br /> 2005 <br /> Construct ì on cost $5,696,000 <br /> Coot ìngencies( 15%) $854,400 <br /> Engineering( 1 0%) $655,040 <br /> TOTAL $7,205,440 <br /> GRAND TOTAL SJ6,I 14,202 <br />