Laserfiche WebLink
<br /> TABLE 5. AGGREGATE COST SUMMARY <br /> 1990 <br /> Construct ion cost $3.594.000 <br /> Contingencies( 151) $539.100 <br /> Eogineertng( lOX) $4 t 3,310 <br /> TOT M. $4,546,410 <br /> 1995 <br /> Construct \00 cost $3,448,500 <br /> Cont ingencies( 15") $517,275 <br /> Engineering( 1 O~) $396,577 <br /> TOTAl $4,362,352 <br /> 2005 <br /> Construct ion cost $5,696,000 <br /> Cont ingencies( 15~) $854,400 <br /> Englneering( 1 O~) $655,040 <br /> TOTM. $7,205,440 <br /> GRANO TOTAL 116.114.202 <br />