Laserfiche WebLink
<br /> Table 8. Summary of Construction Costs <br /> Rivel'9ate Highridge City T ota1 Cost <br /> MUDs MUDs <br /> 1990 1,920,457 1,374,588 298,955 3,594,000 <br /> 1995 1 ,558,679 1,012,33 \ 877,490 3,448,500 <br /> 2005 2,500,819 364,568 2,830,612 5,695,999 <br /> Subtota1 5,979,955 2,751,487 4,007,057 12,738,499 <br /> 15~ Contingencies 896,993 412,723 601,059 1,910,775 <br /> 1 O~ Engineering 687,695 316,42 t 460,8 t 2 1,464,927 <br /> Tote 1 7.564.643 3.480.631 5.068,927 16,114,201 <br />