|
<br /> TABLE 9. COST ALLOCATIONS FOR WASTEWATER
<br /> SERVICE TO RIVERGA TE MUDs. HIGHRIDGE MUDs
<br /> and C I TV OF SAN MARCOS (Includes 15X
<br /> Contingencies and 10X Engineering)
<br /> liNES liFT TREATMENT TOTAL
<br /> ST A TIONS PLANTS COST
<br /> Rivergate
<br /> 1990 1,471 ,654 286,700 671,023 2,429,377
<br /> 1995 0 425,909 1,545,820 1,971,729
<br /> 2005 0 607,389 2,556,148 3,163,537
<br /> Highridge
<br /> 1990 812, 154 130,110 796,590 1,738,854
<br /> 1995 0 116,418 1,164, 180 1,280,598
<br /> 2005 0 38,725 422,453 461 , 178
<br /> City
<br /> 1990 319,561 8,230 50,387 378, 178
<br /> 1995 496,007 288,019 325,999 1,110,025
<br /> 2005 0 487,326 3,093,398 3,580,724
<br /> Tota1 ],099,]76 2,]88,826 10,625,998 16,114,200
<br />
|