Laserfiche WebLink
City of San Marcos Transportation Master Plan <br />Scope of Services <br />input of the Appointed Committee and City staff. The City's commitment to multi -modal transportation <br />solutions and their inter - relationship with other community values expressed in the Comprehensive Plan <br />(e.g., improved mobility, economic development, health, environmental sustainability, livability, etc.) will <br />be clearly explained and illustrated. <br />Task 8.2 — Summary of CIP Projects — HDR will summarize the proposed projects for the CIP. Brief <br />information sheets will be prepared for each project and will be included in the Appendix of the report. <br />Task 8.3 — Summary of Mobility Improvements — HDR will include a summary of the alternatives <br />evaluation process in this section and include a list of improvements that were identified for the TMP. <br />Task 8.4 — Bicycle and Pedestrian Plan — HDR will include a bicycle and pedestrian plan update to <br />guide the future allocation of local resources to address the needs of bicyclists and pedestrians for <br />mobility and safety within the community. <br />Task 8.5 — Prioritization of Improvements — HDR will include a summary of the prioritization process <br />conducted as part of Task 7 in this section. Tasks 5 and 6 will provide systematic and detailed analysis to <br />evaluate the potential transportation improvements. <br />Task 8.6 — Draft and Final Reports — A draft report documenting the methodology findings, and <br />recommendations for the study effort, will be prepared and presented for approval. After receiving <br />comments from the City of San Marcos, Appointed Committee, City Council, and Planning and Zoning <br />Commission, a Final Transportation Master Plan Report will be prepared. <br />Deliverables (electronically in PDF and MS Word format): Draft versions of sections of the TMP will be <br />submitted to the Project Managers electronically in PDF and MS Word format throughout the project as <br />they are completed. These interim reports correspond with final report chapters, which will be organized <br />following consultation with the Project Managers. <br />Transportation Master Plan Report Organization: <br />• Introduction <br />• Goals & Objectives (Task 2) <br />• Existing Conditions (Task 3 and 4). Detailed analysis results will be included in the Appendix. <br />• Issues to Address (Task 3 and 4). Detailed public and stakeholder input will be documented and <br />included in the Appendix. <br />• Recommendations (Tasks 5 and 6). Detailed analysis results will be included in the Appendix. <br />• CIP Project List (Task 7). Project summary sheets will be included in the Appendix. <br />• Thoroughfare Plan (Task 7) <br />• Updated Cross Sections for incorporation into the Transportation Design Manual will be included <br />in the Appendix <br />City of San Marcos Transportation Master Plan <br />