Laserfiche WebLink
City of San Marcos Transportation Master Plan <br />Scope of Services <br />these documents to existing conditions, and against the projected conditions from the travel demand and <br />corridor analysis models. HDR will also identify issues on an intersection and corridor basis, considering <br />the following: pedestrian access, bike lanes, transit facilities /routes, protection of the environment and city <br />beautification. Using City staff and public input, and the results of all data collection, travel demand <br />model results and corridor analysis results, the HDR Team will develop recommendations for policies to <br />be incorporated into the City's TMP. All travel modes will be addressed, ensuring that the Plan will <br />address the needs of all citizens and visitors to San Marcos. A thoroughfare map illustrating the proposed <br />improvements and timeframe will be prepared as part of this task. <br />Task 7.1 — CIP Project List — Based on the analysis and evaluation described in Tasks 5 and 6, the HDR <br />Team will develop a list of recommended CIP projects on an intersection and corridor level. <br />Task 7.2 — Cost Estimates — The HDR Team will develop probable construction cost estimates for the <br />proposed multimodal improvements identified in Tasks 5 and 6. All assumptions utilized to develop these <br />planning level cost estimates will be documented. <br />Task 7.3 — Project Ranking Criteria — The HDR Team, in conjunction with City staff will develop project <br />ranking criteria to evaluate the improvements and to prioritize them based on implementation timeframe. <br />The systematic and detailed analysis used to evaluate potential transportation improvements in Tasks 5 <br />and 6 will provide important information regarding the prioritization of proposed improvements. The <br />analysis will provide policies, a clear systematic evaluation of each scenario, and a recommended ranking <br />order for the alternative scenarios which will be included in the report. This ranking order will be used to <br />prioritize implementation in the short-term (present to year 2020), intermediate range (2020 to 2025) and <br />long -range (2025 to 2035) horizons, based on demand and feasibility. The prioritization will also include <br />identification of the agency or agencies responsible for implementation. <br />Task 7.4 — Funding Plan — HDR and Prime Strategies will develop a funding strategy to implement the <br />proposed improvements to meet the multimodal mobility challenges for the next 20 years. The HDR Team <br />will evaluate existing funding sources and identify potential new and innovative funding mechanisms to <br />implement the improvements. <br />Deliverables — Table of proposed projects /alternatives including ranking, cost estimate and year of <br />completion. Key maps of projects will be prepared. <br />TASK 8 — Transportation Master Plan Document <br />The findings and recommendations of Tasks 1 through 7 will be summarized and documented in a draft <br />of the final City of San Marcos Transportation Master Plan Report. Findings, assumptions, and <br />methodology used in the TMP development will be explained and documented in a Draft and Final <br />Transportation Master Plan. The main document will be designed to be user friendly with clear and <br />concise text supported by high quality graphics and maps that the general public can easily understand. <br />Recommendations will be explained with the minimal use of technical jargon and in ways that clearly <br />explain their intent and value to the community, and their relationship with the Comprehensive Plan goals. <br />Appendices will provide detailed information and technical back -up to support the recommendations. <br />"Vision San Marcos: A River Runs Through Us" report will be utilized as an example in developing the <br />layout, format and content of the TMP Report to maintain consistencies between the reports. All study <br />activity will be documented throughout the duration of the project so as to maintain accurate and <br />consistent records of all data collection, forecast activities, alternative assessments and recommendation <br />development. The HDR Team will address all transportation modes in the Master Plan including autos, <br />bicycles, pedestrians and transit. This task will be completed with the following subtasks: <br />Task 8.1 — Summary of Goals and Objectives — HDR will summarize the vision, goals, and objectives <br />for the City of San Marcos TMP for the 20 year horizon. This task will be accomplished with the extensive <br />City of San Marcos Transportation Master Plan 8 <br />