My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1984-040
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1984
>
Res 1984-040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2007 8:43:45 AM
Creation date
8/31/2007 8:43:45 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
1984-40
Date
5/14/1984
Volume Book
65
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> -2- <br /> 4) the extension begins at the termination <br /> point of the City's existing system. <br /> 5) any valves, fire hydrants or appurtenances <br /> needed beyond the first hundred feet (100') <br /> are paid for by the developer. <br /> 6) the extension is made in a public easement. <br /> If easements are not available, it will be <br /> the developer's responsibility to acquire <br /> them on behalf of the City. <br /> B. For sewer extensions the following requirements shall <br /> apply in addition to those requirements of II A. <br /> 1) Depth required shall be sufficient to develop <br /> the City's system in conformance with the City <br /> of San Marcos Master Plan. <br /> 2) Any lift station required will be financed as <br /> follows: <br /> a) The developer shall pay the total cost for <br /> a system suitable to handle the needs of the <br /> proposed development. <br /> b) Should the City determine that additional <br /> capacity is necessary, the City shall pay <br /> the difference between the cost to install <br /> a system sufficient to meet the needs of <br /> the proposed development and the cost of <br /> the system required by the City. <br /> 3) Ivlanholes, cleanouts and similar appurtenances <br /> beyond the first one hundred feet (100') will be <br /> the responsibility of the developer. <br /> C. Requests for extensions beyond the corporate limits of <br /> the City must be accompanied by a petition for annexation <br /> if the property is contiguous to the corporate limits of <br /> the City. If the property is not contiguous to the corporate <br /> limits of the City, the applicant for extension must state <br /> he or she will petition for annexation when and if the <br /> property becomes contiguous to the corporate limits. In <br /> either case, if the request lS for an extension outside the <br /> corporate limits, the City Council will decide whether <br /> the extension will be granted on a case-by-case basis. <br /> D. Extensions of the sewer system will be made only if the <br /> customer is purchasing City water. <br /> E. Boring of utility lines will be at the developer's expense. <br /> F. Requests for extensions will be considered in order of the <br /> submissions of the requests. Requests will be granted only <br /> when bud.get ed funds are available for such extensions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.