My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1984-049
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1984
>
Res 1984-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2007 2:41:40 PM
Creation date
9/4/2007 2:41:40 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1984-49
Date
5/29/1984
Volume Book
66
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Wastewater Capacity Update <br /> Page 2 <br /> 2) Commitment for future reservations would be modified to <br /> include provision that the applicant would be required <br /> to pay additional package plant charge if the hookup is <br /> made before permanent plant facilities are on-line. <br /> Small users would not be subject to the additional <br /> charge. <br /> 3) Building permits can he issued þefore permanent <br /> improvements are on-lin'e provided it is clear apr:¡licant <br /> cannot obtain certificates of occupancy untii interim <br /> improvements are on-line or provisions for treatment <br /> and/or removal of waste water, by project owner, are <br /> made by project owner. If on-site treatment and/or <br /> removal lS provided, the type and/or method of treatment <br /> and/or removal will require approval of appropriate <br /> state and local agenc1es. <br /> Lf. S.W.T.--An estimate of additional capacity requirements <br /> for SWT has been determined at 32 LUE's. The University <br /> might be required to pay $11,200 ($350 x 32 .LUE ' s) now <br /> and then $900 per LUE if they use above 'the base <br /> established for the University. The use ab ov e the base <br /> will be determined January of 1985. Any wastewater use <br /> above the base plus 32 LUE's would be subject to a <br /> charge of $l,250/LUE. This PQlicy woúld continue until <br /> the permaiRent wastewater treatment improvements are <br /> completed. <br /> S. In order to raise funding for the package plant up <br /> front, contributions will be so~icited from development <br /> interests. These contributions will assist the City in <br /> determining the appropriate Slze of the pac1>age plant <br /> and red~ce financing costs. These contributions will <br /> not represent commitments for any other permit approval, <br /> but. will only reserve sewerage capacity on the package <br /> plant for the contributor. The pr.ocess for arrang1ng <br /> for financing of the plant would be as follows: <br /> a. Developer interest 1S demonstrated by letters to <br /> Council stating future needs. <br /> b. Council decides, on the basis of interest shown, <br /> what size plant will be built. <br /> c. Engineer proceeds with plans, specifications and <br /> state approval. <br /> d. Letters of credit from developers are solicited <br /> until % of the plant capacity is committed. <br /> These letters of credit will be based on a fee per <br /> LUE and will be callable upon execution of the <br /> contract between the City and proposed vendor. <br /> e. Once % of the package plant capacity is <br /> committed, the contract for the package plant will <br /> be bid, awarded and built. <br /> f. After the contract for the package plant is <br /> awarded, LUE charges for the interim capacity will <br /> be 20% more than the original price. <br /> g. If a developer cannot use their package plant <br /> LUE's, they may sell them back to the City. <br /> However, it will be solely up to the City whether <br /> or not to buy them back. The package plant LUE's <br /> are not otherwise transferable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.